State: MADHYA PRADESH District: BHIND Block: ATER Panchayat: BIRGANVANRANI
Work Code: 1702001032/RC/22012034221028 (Pahuch Margh Nirman Majara Rani ke taal se khadara)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2014-2015 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 4/4/2014 Work start date : 11/6/2014
Present status : No Road Proposed Status : Mitti Murram Road
Tech Sanction Details
Technical Sanction No. : 5475/05 Sanction Date : 19/5/2014
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
1000000 491000 0 0 0 0 0 491000 0 1491000
Financial Sanction Details
Financial\Administrative Sanction No: 05/5475 Financial\Administrative Sanction Date 27/5/2014
Fin. Sanc. Amt. (in Rs) NREGA:1491000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
1491000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1signboard125002500
2Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared.112504.146125
3Chain and compass survey.-Canals/Roads1.25584730
4Fly levelling for fixing temporary bench marks.-Above 15 m interval1.25438547.5
5Levelling - Headwork.-Below 5 m interval1.2514601825
6Levelling - Headwork.-Above 15 m interval1.25467583.75
7Stacking and boxing.-Moorum or sand7501511250
8Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars.1427000427000
9Labour only for moorum, kankar, shingle/ gravel/red bajri spreading levelling to gradient and required camber including dressing.75080.560375
10Rolling & Compaction of granular sub-base of well graded material, spreading in uniform layers with tractor mounted grader on prepared surface, mixing by mix in place, sprinkling of water till OMC, and compacting with smooth wheel rollers of 80 to 100 kN75059.744775
11Compaction of embankment with approved materials as per clause 301.4 & 301.5 of specifications for rural roads(MORD), already spreaded at site, obtained from roadway cutting, excavated from drains, foundation of other structures or from borrow pit, making299420.761975.8
12Compaction of soil for construction of subgrade & earthen shoulders with approved material, already spreaded at site, obtained from roadway cutting, drains, foundation of other structures or barrow pits, i/c making 4% camber and required grade by tractor373322.182499.3
13Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed -Dense or hard soil for Road Work6860.581.2557072.6
14Collection of hard moorum including stacking at quarry.750130.898100
15contingency17000070000
16Labour difference in case of old SoR12500025000
Total Activity 1491000
S.NoMaterialQuantityUnit PriceTotal
1Compaction of Earth Work6860.520.7142012.35
2Compaction of Muram75059.744775
3contangency and work charges14500045000
4Sand Transportation750300225000
5SIGN BOARD NO125002500
6Transpotation Charges13100031000
Total Material 491000