S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | (I) 1.50 m. to 3.00 m. | 8750 | 9.91826971428571 | 86784.86 |
2 | (XXIII) 26 Km. Lead | 55 | 430.114363636364 | 23656.29 |
3 | Hearting, casing/cut off filling soil etc.
At optimum moisture content to achieve maximum dry density by mechanical sheep foot roller/ vibratory compacters including watering, required leads and lifts and material etc. complete. | 8750 | 21.7850765714286 | 190619.42 |
4 | Site clearance, cutting grass, raking into heaps and removing off the premises | 10000 | 2.666913 | 26669.13 |
5 | a (iii) Loose or soft soil for Tank Work | 8750 | 100.975669714286 | 883537.11 |
6 | 22cm thick dry stone pitching ( without quarry spalls ) with individual stone of 22 cm depth and minimum size 0.014 cum | 250 | 355.1138 | 88778.45 |