State: MADHYA PRADESH District: SATNA Block: UNCHAHARA Panchayat: BRHAREE
Work Code: 1712004016/RC/22012034180664 (PCC ROAD AND NALI NIRMAN KARUY MUKYA MARG RAMSWAROOP KE GHAR KE PAS SE RAMBIHARI KE GHAR TAK GP BHAR)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2013-2014 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 8/6/2012 Work start date : 26/6/2013
Present status : No Road Proposed Status : Cement Concrete
Tech Sanction Details
Technical Sanction No. : 67/13 Sanction Date : 25/4/2013
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost VIDAYAK NIDHI scheme2 scheme3 Total
90000 60000 0 0 350000 0 0 410000 0 500000
Financial Sanction Details
Financial\Administrative Sanction No: 222/13 Financial\Administrative Sanction Date 1/6/2013
Fin. Sanc. Amt. (in Rs) NREGA:150000 VIDAYAK NIDHI
350000
Scheme 2
0
Scheme 3
0
Total
500000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1signboard125002500
2Dag-beling-Double spade "v" shaped stroke 100mm deep3600.4144
3Labour only for item no.040287.8432.42846.016
4Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal)94.53014284823
5Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal)9.62353.722595.52
6Add to item No. 0413 and 0415 if in place of 40mm metal.-If 20 mm graded metal is used94.5406.238385.9
7False work for R.C.C. and P.C.C. work in plinth and foundation230124.328589
8Providing and filling in position blown bitumen in expansion joints (10cm deep and 1cm Wide)17061020
9Transportation charges of water for every additional 200m or part thereof, beyond initial lead of 200m up to 2 Km. Lead for 87.84131141.92
10Transportation charges of water for every additional 200m or part thereof, beyond initial lead of 200m up to 2 Km. Lead for 103737519
11Add if Lead is more than 5.00Km-For every 0.5 Kms. Lead beyond 10 Kms. and part there of upto 30 Kms.22.09227.525025.9168
12Add if Lead is more than 5.00Km-For every 0.5 Kms. Lead beyond 30 Kms. and part there of upto 50 Kms.88.96252.822489.088
13Transportation of sand44.45785.5234916.364
14Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars.87.84166.3214609.5488
15Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed -Dense or hard soil for Road Work104.373.47655.62
16Earth work in excavation in trenches for foundations and for pipes,cables etc.not exceeding 1.5 m in width and for shafts,cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including gettin-Dense or hard soil5479.94314.6
17Collection of hard moorum including stacking at quarry.87.84118.310391.472
18work charge1909909
19contingency115001500
20Labour difference in case of old SoR616148624
Total Activity 500000
S.NoMaterialQuantityUnit PriceTotal
120 MM B.T.METAL80.321238.1399446.6016
240 mm Metal8.64788.136809.4432
3CEMENT(BEGS)636291185076
4Centring & Shuttering23065.214996
5contangency and work charges11247212472
6Display board115001500
7Mason Payment (Semi Skilled)5425013500
8mixer machin (perday)1780013600
9PhotoCopy & Stationary110051005
10SAND44.471225.8854514.8836
11Vibrator48854080
12Water With Tenkar201503000
Total Material 410000