State: MADHYA PRADESH District: KHANDWA Block: CHHAIGAON MAKHAN Panchayat: BILANKHEDA
Work Code: 1725006013/IF/60 (कपिलधारा कूप निर्माण मेंढ बंधान भूनाडेप एवं वक्षार)
Work Category: Drought Proofing
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2012-2013 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Perspective Plan :
Proposal Date : 1/5/2012 Work start date : 4/6/2012
Present status : Existing Proposed Status : Well
Tech Sanction Details
Technical Sanction No. : 000.213 Sanction Date : 28/5/2012
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
123000 82000 0 0 0 0 0 82000 0 205000
Financial Sanction Details
Financial\Administrative Sanction No: 000.08 Financial\Administrative Sanction Date 4/6/2012
Fin. Sanc. Amt. (in Rs) NREGA:205000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
205000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Loose or soft soil43.19421813.98
2Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Dense or hard soil225429450
3Extra rates for quantities of work executed. In or under water or in foul condition (extra rate for the main item concerned is allowed on account of slow progress of works)193009300
4Extra for every additional Lead beyond 50metres or part thereof upto 200 m for every 50 m lead14118.32580.3
5Providing and placing in position RCC for roof, beams, columns column footing lintels chhajjas, balcony, stairs etc, excluding cost of reinforcement & centring but including finishing & curing.-CC 1:2:4 (1cement, 2sand, 4graded stone aggregate 20 mm nominal size)6.332537.616063.008
6False work for R.C.C. and P.C.C. work in plinth and foundation127128.616332.2
7Providing and placing in position tested steel for R.C.C. work including cutting, bending, binding etc. as per drawings and placing in position complete up to floor two level including cost of binding wire and all wastage etc. complete.-Mild steel and Medium tensile steel bars17851.79202.6
8Stacking and boxing.-Moorum or sand4.512.656.7
9Transportation of metal 145004500
10FOR EARTHEN DAM - Providing fitter blanket, horizontally, including laying, Spreading, packing etc. in layers of required thickness but excluding excavation of foundation.-Metal 40 mm nominal size4.5125.7565.65
11Earth work for well excavation including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Dense or hard soil32.5773.012377.9357
12Earth work for well excavation including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Hard Moorum31.1398.383062.5694
13Earth work for well excavation including disposal or stacking of excavated soil lead upto 50m lift upto 1.5m-Disintegrated or soft rock (not requiring blasting)59.14216.6912815.0466
14Earth work for well excavation including disposal or stacking of excavated soil lead upto 50m lift upto 1.5m-Hard rock requiring blasting.202.7412.583613.75
15work charge13300033000
Total Activity 205000
S.NoMaterialQuantityUnit PriceTotal
120 mm HG Chips000
2Blasting Holas1507010500
3BULLOCK CART244009600
4Cement(bori)3530510675
5Centering and Shuttering9090.68154
6CONTANGANCY12930029300
7deasil pump36001800
8metal(t)5761.53807.5
9Sand2.5561.351403.375
10STEEL11060.76677
11T & P000
Total Material 82000