Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 25-Jun-2024 12:58:38 PM 
Back  
State: MADHYA PRADESH District: GWALIOR Block: BHITARWAR Panchayat: PALAYCHHA(P)
Work Code: 1703004041/IF/22012034312957 (NADEP COMPOST PIT NIRMAN-RATRAM /KUNDAN)
Work Category: Drought Proofing
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2016-2017 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : No Perspective Plan : No
Proposal Date : 15/4/2016 Work start date : 19/1/2017
Present status : Not Exist Proposed Status : NADEP Composting
Tech Sanction Details
Technical Sanction No. : 2887/41 Sanction Date : 15/11/2016
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
10471 5167 0 0 0 0 0 5200 0 15638
Financial Sanction Details
Financial\Administrative Sanction No: 29/41 Financial\Administrative Sanction Date 20/12/2016
Fin. Sanc. Amt. (in Rs) NREGA:15638 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
15700
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Earth work in excavation in trenches for foundations and for pipes, cables etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including getti-Dense or hard soil2.30595218.975
2Filling foundation or under floor with 40mm gauge graded metal and moorum including ramming in layers and watering.1.1528711003.392
3Providing and laying damp proof course 50mm thick with C.C.1:2:4 with 20mm size graded stone aggregate. including curing.6.877194.61338.2642
4Random / uncoursed rubble masonry in plinth and foundation with mud mortar including levelling at plinth level.7.074983.76958.6938
5Random / uncoursed rubble masonry in plinth and foundation including levelling up with cement concrete 1:6:12 (1cement, 6coarse sand, 12 aggregate 20mm nominal size) at plinth level.-In Lime mortar 1:3 (1lime putty, 3sand)1639639
6Pointing on CR masonry with cement mortar 1:4(1cement, 4sand)-Ruled pointing2662.81632.8
7Transportation of sand12.123317.413847.96143
Total Activity 15700
S.NoMaterialQuantityUnit PriceTotal
1Bricks1.409296.9418.3321
2Cement2.7275742.5
3GITTI7.074463.613279.57714
4Mate0.351450507.5
5Mooram0.40312650.778
6Sand0.187870162.69
Total Material 5200