Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 27-Jun-2024 05:46:44 PM 
Back  
State: MADHYA PRADESH District: BHIND Block: ATER Panchayat: MOGHANA
Work Code: 1702001004/RC/22012034267482 (Gravel road Main road shukalpura joint to panchayet bhaven modhana)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2015-2016 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 14/4/2015 Work start date : 22/7/2015
Present status : No Road Proposed Status : Gravel Road
Tech Sanction Details
Technical Sanction No. : 16 N Sanction Date : 15/7/2015
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
757000 423000 0 0 0 0 0 423000 0 1180000
Financial Sanction Details
Financial\Administrative Sanction No: 02/16 N Financial\Administrative Sanction Date 16/7/2015
Fin. Sanc. Amt. (in Rs) NREGA:1180000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
1180000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1signboard150005000
2Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared.117004.451480
3Chain and compass survey.-Canals/Roads1.3628816.4
4Fly levelling for fixing temporary bench marks.-Above 15 m interval1.3471612.3
5Levelling - Headwork.-Below 5 m interval1.315702041
6Levelling - Headwork.-Above 15 m interval1.3502.4653.12
7Stacking without boxing.-Puddle earth, moorum, sand or kankar78011.38814
8Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars.1309000309000
9Labour only for moorum, kankar, shingle/ gravel/red bajri spreading levelling to gradient and required camber including dressing.78044.134398
10Rolling & Compaction of granular sub-base of well graded material, spreading in uniform layers with tractor mounted grader on prepared surface, mixing by mix in place, sprinkling of water till OMC, and compacting with smooth wheel rollers of 80 to 100 kN78068.753586
11Compaction of embankment with approved materials as per clause 301.4 & 301.5 of specifications for rural roads(MORD), already spreaded at site, obtained from roadway cutting, excavated from drains, foundation of other structures or from borrow pit, making1254.15430.938753.3586
12Compaction of soil for construction of subgrade & earthen shoulders with approved material, already spreaded at site, obtained from roadway cutting, drains, foundation of other structures or barrow pits, i/c making 4% camber and required grade by tractor2887.79835.8103383.1684
13Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed -Dense or hard soil for Road Work4597.28587.3401342.9805
14Collection of hard moorum including stacking at quarry.780140.7109746
15contingency15044050440
16Labour difference in case of old SoR195249524
Total Activity 1180000
S.NoMaterialQuantityUnit PriceTotal
1Board150005000
2Compaction of Earth Work1254.1530.938753.235
3Compaction of GSB78068.753586
4Compaction of Selected soil2887.835.8103383.24
5contangency and work charges12600026000
6Kilometre Stone (200 M)65003000
7Kilometre Stone (ordinary)330009000
8laboure work mate /waterman12000020000
9Transportation charges1164000164000
Total Material 423000