S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Collection of approved soil having CBR not less then 12, including stacking at quarry. | 1200 | 185.38 | 222456 |
2 | Transportation of metal | 1 | 162391.27 | 162391.27 |
3 | Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars. | 1200 | 89.93 | 107916 |
4 | Providing single coat surface dressing with paving bitumen using 18kg. of bitumen 80/100 per 10 sqm with 0.15cum of stone chipping 13.2mm nominal size per 10 sqm of road surface for second coat and rolling complete with power roller exceeding 8 tonne. | 1200 | 132.04 | 158448 |
5 | Compaction of soil for construction of subgrade & earthen shoulders with approved transported material collected and stacked at site, i/c spreading, making 4% camber and required gradient by tractor mounted grader or labourers, watering at OMC and compact | 1200 | 36.07 | 43284 |
6 | Construction of gravel base course by naturally occurred gravel or river born material or by crushed metal or mixture of two or more to bring the material in appropriate grading confirming to clause 2.2.2.2, plasticity characteristics of fines as per clau | 517.25 | 548.1 | 283504.725 |