State: MADHYA PRADESH District: GWALIOR Block: BHITARWAR Panchayat: SHYAMPUR(P)
Work Code: 1703004074/WC/22012035206573 (Loose Bolder Nirman Shantidham ke Peechhe Nale Par Shyampur)
Work Category: Water Conservation
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2024-2025 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : No Perspective Plan : No
Proposal Date : 8/6/2024 Work start date : 20/6/2024
Present status : Non-existent Proposed Status : Constr of Boulder Anicut Check Dam for Community
Tech Sanction Details
Technical Sanction No. : 1703004/2024-2025/65998/TS Sanction Date : 14/6/2024
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
141342.5 113186.66 29.7 12272.76 0 0 0 126000 0 266831.62
Financial Sanction Details
Financial\Administrative Sanction No: 1703004/2024-2025/65998/AS Financial\Administrative Sanction Date 14/6/2024
Fin. Sanc. Amt. (in Rs) NREGA:266833 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
267000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared.15008.3668066666666712550.21
2Providing and laying in foundation, plinth and under floors cement concrete with 20mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work ( if 20 mm metal is used in place of 40mm metal in item number 04.13 & 04.15) (a) C.C. 1:2:4 (1cement, 2sand, 4metal)1.24461.758333333335354.11
3(X) 5.0 Km. Lead72270.18222222222219453.12
4Construction of boulder/stone wall, boulder check etc. as per drawing and specifications in mud mortar or dry, one side of the wall guard walls, temporary diversion etc. including all materials, labour complete721507.89305555556108568.3
5(b) Dense or hard soil634186.761545741325118406.82
Total Activity 265000
S.NoMaterialQuantityUnit PriceTotal
10002-Hire charges of Concrete Mixer 0.25 to 0.40 cum with Hopper0.121000120
20084-Hire charges of Diesel truck - 9 tonne (without POL)3.8828967621008154.083196
30297-Stone Aggregate(single size): 10 mm nominal size0.13265085.8
40367-Portland Cement0.39664002534.4
50983-Fine sand (zone IV)0.541025553.5
61235-Diesel oil45.00277351004500.27735
73-Display Board / CIB125002500
85001-Mobil oil1.59198767270429.8366709
9MR6050-Boulder - quarried, black trap, baysalt or granite (1808B 10%)86.473163158.4
10MR6082-Stone Aggregate (Metal) 20mm nominal size (BT Metal) (Rate at quarry)0.888790701.52
Total Material 82800