S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Earth work in excavation in foundation trenches or drain i/c dressing of sides and ramming of bottom lift upto 1.5m i/c getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50 m(1.10.1) Loose/Soft Soil | 80 | 1800 | 144000 |
2 | Earth work in excavation in hill cutting including disposal of excavated earth lead upto 50 metre and lift upto 1.5 metre disposed earth to be leveled and neatly dressed in- soft soil
| 2181 | 10 | 21810 |
3 | Collection of staking materials with staking charges | 150 | 500 | 75000 |
4 | Construction of mount by collecting earth from the nearby area. For mound of sized (a) Diameter 30 cm. at top 60 cm. at bottom and height 30 cm | 30 | 400 | 12000 |
5 | Colour washing two coats over a coat of white washing with shell lime and colouring materials per one sqmt. | 1 | 6490 | 6490 |
6 | Digging of planting pits (the dug out soil to be heaped near the pits up hillsides) for pits of size (c) 60cm x 60cm x 60cm | 100 | 250 | 25000 |
7 | Cost of Planting Materials (Seed/Stump), transportation charges to the Work site. | 80 | 250 | 20000 |
8 | Cost of Planting Materials (Seedling), transportation charges to the Work site. | 18 | 6000 | 108000 |
9 | Earth work in excavation in All kinds of earth in foundation including all leads and lifts including rough dressing and breaking clods deposited the excavated materials away from work site. | 90 | 3000 | 270000 |
10 | Earth work in excavation in foundation in hard soil including all leads and lifts including rough dressing and breaking clods deposited the excavated materials away from work site. | 6000 | 35 | 210000 |