S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | signboard | 1 | 2500 | 2500 |
2 | Setting out work Refferance pillers, refferancing bench mark and temporary bench mark Construction of Reference Bench Mark 50x50x70 cm. made of 1:3:6 cement concrete i/c excavation of 50x50x50 cm pit, working benchmark 30x30x45 cm at every 500 m interva | 2 | 3254.5 | 6509 |
3 | Add to or deduct from the rate for bore holes of 3.5metre depths, if the bore-holes are made deeper or shallower than 3.5metres.-200mm | 2 | 1700 | 3400 |