S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.Hard moorum for Well Work | 2160 | 127.2092592593 | 274772.000000088 |
2 | Excavation in trenches for foundations and for pipes, cables, etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms, lift upto 1.5m including getting out and-Disintegrated or soft rock (not requiring blasting) | 6000 | 1.8 | 10800 |
3 | seeds sowing in broadcost method in beds Mandays per bed. | 2000 | 8.51 | 17020 |
4 | Field Technical Supervisior Charge-FTSC | 2000 | 5.294 | 10588 |