S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Site clearance, cutting grass, raking into heaps and removing off the premises | 10000 | 1.4 | 14000 |
2 | Dag-beling-Double spade "v" shaped stroke 100mm deep | 3000 | 0.2 | 600 |
3 | Stacking without boxing.-Puddle earth, moorum, sand or kankar | 4068 | 7.2 | 29289.6 |
4 | Transportation charges of water for every additional 200m or part thereof, beyond initial lead of 200m up to 2 Km. Lead for | 6075 | 12.8 | 77760 |
5 | Transportation of metal | 4068 | 91.7 | 373035.6 |
6 | Transportation of metal | 495 | 111.1 | 54994.5 |
7 | Labour only for moorum, screening or binding material as per MOST 2004 clause 400.2.6 spreading on boulder or WBM coat as per MOST 2004 clause 404.2.7 | 4563 | 34 | 155142 |
8 | Rolling & Compaction of granular sub-base of well graded material, spreading in uniform layers with tractor mounted grader on prepared surface, mixing by mix in place, sprinkling of water till OMC, and compacting with smooth wheel rollers of 80 to 100 kN | 6075 | 18.55 | 112691.25 |
9 | Providing and laying reinforced cement concrete pipes N.P.3 for culverts including pointing ends, and fixing collar with cement martar 1:2 complete.-1000 mm dia. | 38.987 | 3909.1 | 152404.0817 |
10 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed -Dense or hard soil for Road Work | 1512 | 67.8 | 102513.6 |
11 | Collection of hard moorum including stacking at quarry. | 4000.99 | 109.3 | 437308.207 |
12 | contingency | 26807.428 | 3.5 | 93825.998 |
13 | Earth work exavation in stony earth with all lead and lift including rough dressing and breaking of clods to maximum 5 cm to 7 cm and laying in layers not exceeding 0.3 m in depth as per direction of engineer in charge. | 0 | 0 | 0 |