Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 28-Sep-2024 12:01:34 AM 
Back  
State: MADHYA PRADESH District: DAMOH Block: JABERA Panchayat: KORATA
Work Code: 1711006051/WC/22012034582921 (gabian structure/ pooran mishra ke khet ke pass/korta)
Work Category: Water Conservation
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2020-2021 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : No Perspective Plan : No
Proposal Date : 7/6/2020 Work start date : 11/9/2020
Present status : Non-existent Proposed Status : Constr of Gabion Anicut for Community
Tech Sanction Details
Technical Sanction No. : 1711006/2020-2021/386566/TS Sanction Date : 9/10/2020
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
78455.82 93805.18 10592 7866.49 0 0 0 113000 0 190719.49
Financial Sanction Details
Financial\Administrative Sanction No: 1711006/2020-2021/386566/AS Financial\Administrative Sanction Date 9/10/2020
Fin. Sanc. Amt. (in Rs) NREGA:191007 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
192000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Steel work welded in built up sections, framed work, including cutting hoisting fixing in position in gratings, frames, guard bars, ladders, railing, brackets and similar works & trusses and trussed purlins up to 25m span and 15 m over all height764.285.936914420308865672.99
2(VI) 3.0 Km. Lead120139.213516705.62
3(a) Boulders120570.82516666666768499.02
4c (iii) Hard moorum for Tank Work29.4178.7377551020415254.89
5a (i) Disintegrated or soft rock (not requiring blasting) for Tank Work21568.94809523809511947.91
6Collection of boulders at source (maximum size 0.014cum) without quarrying i.e. picked up boulders.120161.02519323
7Citizen Information Board Size 0.9 Meter x 1.2 Meter ( Community Works )13603.483603.48
Total Activity 192000
S.NoMaterialQuantityUnit PriceTotal
10002-Hire charges of Concrete Mixer 0.25 to 0.40 cum with Hopper0.018858.85
20084-Hire charges of Diesel truck - 9 tonne (without POL)4.028222429031.2244
30367-Portland Cement0.02895511159.2679
40368-White cement 0.0004157446.2976
50983-Fine sand (zone IV)0.0471076.2550.58375
61004-Average rate of mild steel round bars for reinforcements2.9446519215288.3632
71008-Flats up to 10 mm in thickness5.2583472024819.176
81215-Welding by electric plant2103.30281.182481.897304
91235-Diesel oil33.6354682287.2072
105001-Mobil oil1.2085182.9221.03465
117900-Modular common burnt clay bricks of class designation 7.5244.44.131009.372
12MR6001-Stone Aggregate(single size): 40 mm nominal size other than BT0.06552534.125
13MR6032-Snowcem/ durocem0.00072778919.4523
14MR6082-Stone Aggregate (Metal) 20mm nominal size (BT Metal) (Rate at quarry)0.02468216.368
15MR6101-Boulder - picked up (1807)12014717640
Total Material 73100