Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 28-Sep-2024 12:05:35 AM 
Back  
State: MADHYA PRADESH District: KATNI Block: DHIMERKHEDA Panchayat: ATRIYA
Work Code: 1744006066/WC/22012034529590 (नाला जलसंवर्धन कार्य धवहा नाला अतरिया)
Work Category: Water Conservation
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2019-2020 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : No Perspective Plan : No
Proposal Date : 26/1/2020 Work start date : 5/3/2020
Present status : Non-existent Proposed Status : Construction of Community Water Harvesting Ponds
Tech Sanction Details
Technical Sanction No. : 1744006/2019-2020/47568/TS Sanction Date : 4/3/2020
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
619800.32 227308.06 71.93 45298.91 0 0 0 273000 0 892479.22
Financial Sanction Details
Financial\Administrative Sanction No: 1744006/2019-2020/47568/AS Financial\Administrative Sanction Date 4/3/2020
Fin. Sanc. Amt. (in Rs) NREGA:892766 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
893000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared.30006.0599118179.73
222cm thick dry stone picked up boulder pitching i/c picking of boulder with individual size of 22cm depth.912.5195.094498630137178023.73
3Providing stone chips under stone pitching256.5450.345692007797115513.67
4(VI) 3.0 Km. Lead200.75156.44747198007531406.83
5(c) Hard moorum for Tank Work, lift of up to 3m depth1800146.52263736
6b (iii) Dense or hard soil for Tank Work2250124.3279675
7Loosing of hard soIl such as moorum etc. By ploughing (tractor ect.) the existing ground exceeding 30cm in depth as well as 10 sqm on plan including all running expanses of machine.7503.600186666666672700.14
8Citizen Information Board Size 0.9 Meter x 1.2 Meter ( Community Works )13530.013530.01
Total Activity 893000
S.NoMaterialQuantityUnit PriceTotal
10002-Hire charges of Concrete Mixer 0.25 to 0.40 cum with Hopper0.018858.85
20084-Hire charges of Diesel truck - 9 tonne (without POL)7.7497224217374.8274
30367-Portland Cement0.02895511159.2679
40368-White cement 0.0004157446.2976
50983-Fine sand (zone IV)0.0471076.2550.58375
61235-Diesel oil64.7097684400.2596
72903-Stone chippings/ screenings 4.75 mm nominla size256.535791570.5
85001-Mobil oil2.3249182.9425.22421
97753-Boulder 50 mm to 200 mm273.7514740241.25
107900-Modular common burnt clay bricks of class designation 7.5244.44.131009.372
11MR6001-Stone Aggregate(single size): 40 mm nominal size other than BT0.06552534.125
12MR6032-Snowcem/ durocem0.00072778919.4523
13MR6082-Stone Aggregate (Metal) 20mm nominal size (BT Metal) (Rate at quarry)0.02468216.368
14MR6089-Hire Charges for tractor with ploughing arrangement including running expanses and driver3.3757082389.5
Total Material 158000