State: MADHYA PRADESH District: REWA Block: GANGEV Panchayat: DEWAS
Work Code: 1713004012/WC/22012034950713 (Amrit Sarovar Nirman Gram Dewas)
Work Category: Water Conservation
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2022-2023 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 1/4/2022 Work start date : 16/4/2022
Present status : Non-existent Proposed Status : Construction of Earthen graded Bund for Community
Tech Sanction Details
Technical Sanction No. : 4012/30 Sanction Date : 1/4/2022
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost 15th Finance Commission scheme2 scheme3 Total
547000 0 0 0 568000 0 0 568000 0 1115000
Financial Sanction Details
Financial\Administrative Sanction No: 4012/2153 Financial\Administrative Sanction Date 7/4/2022
Fin. Sanc. Amt. (in Rs) NREGA:547000 15th Finance Commission
568000
Scheme 2
0
Scheme 3
0
Total
1115000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1signboard135303530
2Site clearance, cutting grass, raking into heaps and removing off the premises3268.576.6521735.9905
3Work charge245.1416039222.4
4Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Dense or hard soil660.6513991830.35
5Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Hard moorum1473.78181.56267579.4968
6Earth work in excavation in trenches for foundations and for pipes, cables etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including getti-Dense or hard soil165.65158.9426328.411
7Dag-beling-Single spade stroke minimum 75mm deep3900.38148.2
8Extra for every additional lift of 1.5 m or part there of-Loose/soft soil and dense/hard soil736.8912.49137.436
9Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal)37.813829.12144779.0272
10Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal)5.93175.7818737.102
11False work for R.C.C. and P.C.C. work in plinth and foundation92.14172.0115849.0014
1222cm thick dry stone pitching (without quarry spalls) with individual stone of 22cm depth and minimum size 0.014257.14370.2695208.6564
13Transportation charges of water for every additional 200m or part thereof, beyond initial lead of 200m up to 2 Km. Lead for 2406.912.395752.5149
14Transportation rates for Boulders, Laterite, rubble pitching stones and excavated hard rock.71.07242.2917219.5503
15Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars.1674.44111.75187118.67
16Compaction of soil for construction of subgrade & earthen shoulders with approved material, already spreaded at site, obtained from roadway cutting, drains, foundation of other structures or barrow pits, i/c making 4% camber and required grade by tractor2206.2521.7948074.1875
17FOR EARTHEN DAM - Puddle filling of good clay including lead upto 50m including mixing watering and kneeding by tamping ramming and laying etc.200.66561.6112690.656
18FOR EARTHEN DAM - Construction of rock toe in earthen embankments including laying and hand packing, dressing, wedging and finishing over surface with.-Boulders14.5667.39675.85
Total Activity 1115000
S.NoMaterialQuantityUnit PriceTotal
1Convergence Amount1568000568000
Total Material 568000