State: MADHYA PRADESH District: SATNA Block: UNCHAHARA Panchayat: PIPAROKHAR
Work Code: 1712004017/AV/22012034391095 (SHANTI DHAM NIRMAN KARYA TURRI)
Work Category: Anganvany
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2018-2019 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Perspective Plan :
Proposal Date : 21/9/2018 Work start date : 24/9/2018
Present status : NEW Proposed Status : Construction of Crematorium for Community
Tech Sanction Details
Technical Sanction No. : 5@18-19 Sanction Date : 24/9/2018
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
SK/SemiSK Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
20000 160000 0 0 0 0 0 160000 0 180000
Financial Sanction Details
Financial\Administrative Sanction No: 5*18*19 Financial\Administrative Sanction Date 22/9/2018
Fin. Sanc. Amt. (in Rs) NREGA:180000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
180000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Dense or hard soil10.038117.51179.465
2Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal)1.9362666.55162.344
3Providing and placing in position RCC for roof, beams, columns column footing lintels chhajjas, balcony, stairs etc, excluding cost of reinforcement & centring but including finishing & curing.-CC 1:1.5:3 (1cement, 1.5sand, 3graded stone aggregate 20 mm nominal size)4.134235.817493.854
4False work for R.C.C. and P.C.C. work in plinth and foundation18.528228.54233.648
5Class 25 open bhatta or pajawa burnt brick masonry in plinth and foundation.-Cement lime mortar 1:1:6 (1cement, 1lime, 6sand)3.5682719.29702.1056
6Steel work welded in built up sections, framed work, including cutting hoisting fixing in position in gratings, frames, guard bars, ladders, railing, brackets and similar works & trusses and trussed purlins up to 25m span and 15 m over all height1204.5471.786365.518
7Steel work in built up tubular trusses including cutting, hoisting, fixing in position, welded and bolted including special shaped washers etc. complete of Mild steel tubes, electric resistant or induction butt welded247.06370.617442.6478
815mm thick cement plaster on rough side of wall in-Cement mortar 1:3 (1cement, 3sand)21.66125.32713.998
9Providing corrugated C.I. sheet of class III roofing fixed with galvanised iron J or L hooks bolts and nuts 8mm diameter with bitumen and G.I. limpet washers or with complete excluding the cost of purlins, rafters and trusses.-0.63 mm thick sheet.125270.9225270.92
10Providing ridges or hips 600mm over all in plain G.I. sheet class III fixed with galvanised iron J or L hooks bolts and nuts 8mm diameter G.I. limpet bitumen washers complete.-0.80 mm thick sheet.6.4404.42588.16
11Lossening of hard soil by ploughing the existing gound143.752.7388.125
12Lossening of hard soil by ploughing the existing goundSpreading, dressing , breaking of clods of ploudged earth upto 20 m, lead and lift upto 1.5 mt, disposed soil to be leveled and neatly dressed143.75507187.5
Total Activity 180000
S.NoMaterialQuantityUnit PriceTotal
120 M.M. METAL4.7812505975
2Bricks18003.255850
3CEMENT152854275
4Iron angles, Trusses, wind tie1204.546679499.64
5IRON SRIYA240.655.213281.12
6SAND.2.681745.164677.0288
7Tean Shad51.2857.243888.64
8TRAINSPORT CHARGE12533.582533.58
Total Material 160000