S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Extra for every additional lift of 1.5 m or part there of-Loose/soft soil and dense/hard soil | 1357.88 | 10.7 | 14529.316 |
2 | 22cm thick dry stone pitching (without quarry spalls) with individual stone of 22cm depth and minimum size 0.014 | 96 | 260.4 | 24998.4 |
3 | Lossening of hard soil by ploughing the existing gound | 3003.76 | 2.7 | 8110.152 |
4 | Lossening of hard soil by ploughing the existing goundSpreading, dressing , breaking of clods of ploudged earth upto 20 m, lead and lift upto 1.5 mt, disposed soil to be leveled and neatly dressed | 3003.76 | 50 | 150188 |
5 | work charge | 1 | 19675.5 | 19675.5 |