State: MADHYA PRADESH District: DAMOH Block: JABERA Panchayat: KORATA
Work Code: 1711006051/IF/911 (कपिल धारा कूप निर्माण कार्य/ बद्री प्रसाद रामदीन राय/ कोंरता)
Work Category: Drought Proofing
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2009-2010 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Perspective Plan :
Proposal Date : 2/11/2009 Work start date : 10/11/2009
Present status : Not Exist Proposed Status : Well
Tech Sanction Details
Technical Sanction No. : 1259/758 Sanction Date : 28/3/2013
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
132000 57000 0 0 0 0 0 57000 0 189000
Financial Sanction Details
Financial\Administrative Sanction No: 11/01/2 Financial\Administrative Sanction Date 10/11/2009
Fin. Sanc. Amt. (in Rs) NREGA:189000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
189000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Extra for every additional Lead beyond 50metres or part thereof upto 200 m for every 50 m lead19819.83920.4
2Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20cm in depth consolidating each deposited layers by ramming and watering lead upto 50m and lift upto 1.5m20632.46674.4
3Labour only for item no. 04048.1143.61163.16
4Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal)0.32969.1890.73
5Random / uncoursed rubble masonry in plinth and foundation with mud mortar including levelling at plinth level.65900.658539
6Random / uncoursed rubble masonry in plinth and foundation including levelling up with cement concrete 1:6:12 (1cement, 6coarse sand, 12 aggregate 20mm nominal size) at plinth level.-In Cement mortar 1:8 (1cement, 8sand)3.51754.96142.15
7Providing and fixing fine dressed cut stone lintels of any size including setting in C.M. 1:2.0.4595784310.1
8Add extra for brick masonry circular in plan, I/c wells to a mean radius not exceeding 6m (Such as well stening and other similar type of works)72.645241.217521.974
9Add to item no.0605 and 0609 for well staining-For every 3meter up to 15 meter depth.95156.314848.5
10Labour only for spreading, hand packing, and levelling to gradient and required camber as per MOST 2004 clause 404.3.3 of metal, grade-1 As per MOST 2004 clause 400.2.5 including dressing.8.1272.42206.44
11Add in item No. 2401 for lift. (In well excavation)-For every 0.50 m after 1.5 m initial depth upto 6.0 m211.536.61396.098
12Add in item No. 2401 for lift. (In well excavation)-For every 0.50 m after 6.0 m initial depth upto 10.5 m1508.71305
13Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed - Dense or hard soil for Well Work25010025000
14Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.Hard moorum for Well Work150108.816320
15Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal or stacking of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.Disintegrated or soft rock (not requiring blasting) for Well Work88.742293.826072.3996
16Collection of boulders at source (maximum size 0.014cum) without quarrying i.e. picked up boulders.9248.92240.1
Total Activity 189000
S.NoMaterialQuantityUnit PriceTotal
120 M.M. METAL.0.25600150
2Cement(bori)92602340
3deasil pump75003500
4Display board120002000
5MASON (PERDAY)40266.6310665.2
6Masonry Stone6033019800
7Photo copy2502500
8Photograph51050
9Pipe1500500
10Sand1.656251031.25
11TRAINSPORT CHARGE15868.44115868.44
12Transportaion of sand (Trip)1.65230379.5
13फरसी4500.45202.5
Total Material 57000