Work Code: 1702001066/AV/22012034568268 (Cattal protection wall at shanti dham Gopalpura)
Work Category: Anganvany
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2021-2022 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Perspective Plan :
Proposal Date : 14/4/2021 Work start date : 13/6/2021
Present status : NEW Proposed Status : Constr of CmpOnd wall for gov schools for Comm
Tech Sanction Details
Technical Sanction No. : 93/21 Sanction Date : 10/5/2021
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
SK/SemiSK Est. Skilled Cost Est. Semi-Skilled Cost 15th Finance Commission scheme2 scheme3 Total
146000 0 0 0 435000 0 0 435000 0 581000
Financial Sanction Details
Financial\Administrative Sanction No: 05/./as. Financial\Administrative Sanction Date 10/5/2021
Fin. Sanc. Amt. (in Rs) NREGA:146000 15th Finance Commission
435000
Scheme 2
0
Scheme 3
0
Total
581000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Earth work in excavation in trenches for foundations and for pipes, cables etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including getti-Dense or hard soil70.376.95406.07
2Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20cm in depth consolidating each deposited layers by ramming and watering lead upto 50m and lift upto 1.5m70.56392751.84
3Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal)12.82414.730908.16
4Providing and placing in position RCC for roof, beams, columns column footing lintels chhajjas, balcony, stairs etc, excluding cost of reinforcement & centring but including finishing & curing.-CC 1:1.5:3 (1cement, 1.5sand, 3graded stone aggregate 20 mm nominal size)30.33760.3113937.09
5False work for lintels slabs, columns, walls, sills, chhajjas balconies, beams, stair cases or ornamental moulded work, curved surface etc. cast in situ including all lead and lift130.33195.425466.482
6False work for R.C.C. and P.C.C. work in plinth and foundation118.58132.515711.85
7Class 25 open bhatta or pajawa burnt brick masonry in plinth and foundation.-Cement mortar 1:6 (1cement, 6sand)20.52849.458412.7
8Add for masonry in supper structure above plinth level up to floor two level55.52982.1165506.55
9Steel work welded in built up sections, framed work, including cutting hoisting fixing in position in gratings, frames, guard bars, ladders, railing, brackets and similar works & trusses and trussed purlins up to 25m span and 15 m over all height11861.37233.4
10Providing and placing in position tested steel for R.C.C. work including cutting, bending, binding etc. as per drawings and placing in position complete up to floor two level including cost of binding wire and all wastage etc. complete.-Cold twisted / Hot rolled deformed / Thermo mechanicaly treated steel bars1902.6550.896654.62
1115mm thick cement plaster on rough side of wall in-Cement mortar 1:5 (1cement, 5sand)45799.445425.8
12Distempering with dry distemper of approved brand and manufacture (two coats) and of required shade on undecorated wall surfaces to give an even shade, over and including priming coat of whiting after thoroughly brushing the surface free from mortar dropp45729.213344.4
13Painting with enamel paint, brushing, interior to give an even shade I/n cleaning the surface of all dirt dust and other foreign matter on steel and other metal surfaces.-2 coats4.453.6235.84
Total Activity 581000
S.NoMaterialQuantityUnit PriceTotal
1Convergence Amount1435000435000