Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 26-Jun-2024 05:18:44 PM 
Back  
State: MADHYA PRADESH District: DAMOH Block: JABERA Panchayat: KORATA
Work Code: 1711006051/IF/22012034459329 (khet talab nirman/kailash/gyani/pipariya/korta)
Work Category: Drought Proofing
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2018-2019 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : No Perspective Plan : No
Proposal Date : 2/10/2018 Work start date : 5/2/2019
Present status : Not Exist Proposed Status : Construction of Farm Ponds for Individuals
Tech Sanction Details
Technical Sanction No. : ts-13/051 Sanction Date : 28/12/2018
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
250000 38000 0 0 0 0 0 38000 0 288000
Financial Sanction Details
Financial\Administrative Sanction No: as-17/51 Financial\Administrative Sanction Date 28/12/2018
Fin. Sanc. Amt. (in Rs) NREGA:288000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
288000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1signboard120002000
2Contingency12.6100012600
3Extra for every additional Lead beyond 50metres or part thereof upto 200 m for every 50 m lead29721.96504.3
4TRANSPORTATION OF MATERIAL1031000103000
522cm thick dry stone pitching (without quarry spalls) with individual stone of 22cm depth and minimum size 0.014105260.627363
6Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed - Dense or hard soil for Well Work742.2119.788841.34
7Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.Hard moorum for Well Work248.5117.729248.45
8Collection of puddle earth including stacking at quarry155.6117.718314.12
Total Activity 288000
S.NoMaterialQuantityUnit PriceTotal
120 mm HG Chips1.58501275
240 mm size HG metal0.5500250
3bolader4552023400
4Cement53001500
5Display board120002000
6Sand (mortar)1.58501275
7Transportation charges183008300
Total Material 38000