State: MADHYA PRADESH District: REWA Block: GANGEV Panchayat: DUBAHAI KHURD
Work Code: 1713004056/RC/22012034209019 (खेतसडक आमा देवी से खैरही नाला ज्‍ै 1624 )
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2013-2014 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 15/8/2013 Work start date : 20/2/2014
Present status : Earthern road Proposed Status : Gravel Road
Tech Sanction Details
Technical Sanction No. : 1624/56 Sanction Date : 10/1/2014
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
586000 390000 0 0 0 0 0 390000 0 976000
Financial Sanction Details
Financial\Administrative Sanction No: 02/56/ Financial\Administrative Sanction Date 11/1/2014
Fin. Sanc. Amt. (in Rs) NREGA:976000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
976000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1signboard115001500
2Survey & Investigation7.27200014540
3Site clearance, cutting grass, raking into heaps and removing off the premises124201.619872
4Dag-beling-Single spade stroke minimum 75mm deep27000.2540
5Filling foundation and around masonry work with moorum I/c ramming layers and watering.5.0625145.4736.0875
6Transportation charges of water for every additional 200m or part thereof, beyond initial lead of 200m up to 2 Km. Lead for 3766.5622599
7Transportation of metal 2879.55102.69295700.9895
8Rolling & Compaction of granular sub-base of well graded material, spreading in uniform layers with tractor mounted grader on prepared surface, mixing by mix in place, sprinkling of water till OMC, and compacting with smooth wheel rollers of 80 to 100 kN22532.87380
9Providing and laying reinforced cement concrete pipes N.P.3 for culverts including pointing ends, and fixing collar with cement martar 1:2 complete.-900 mm dia.37.53476130350
10Compaction of embankment with approved materials as per clause 301.4 & 301.5 of specifications for rural roads(MORD), already spreaded at site, obtained from roadway cutting, excavated from drains, foundation of other structures or from borrow pit, making1741.521.537442.25
11Compaction of soil for construction of subgrade & earthen shoulders with approved transported material collected and stacked at site, i/c spreading, making 4% camber and required gradient by tractor mounted grader or labourers, watering at OMC and compact148526.238907
12Compaction of hard shoulder collected at site, i/c making 4-5% camber by tractor mounted grader or labourers, watering at OMC and compacting with 80 to 100 kN static weight rollers to achieve desired density minimum 100% of the MDD as per IS:2720 (Part-7)148.539.65880.6
13Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-oose or soft soil for Well Work422.4581.234302.94
14Earth work in excavation in trenches for foundations and for pipes,cables etc.not exceeding 1.5 m in width and for shafts,cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including gettin-Dense or hard soil37.5888.33318.314
15Collection of puddle earth including stacking at quarry2879.55112.8324813.24
16Collection of hard moorum including stacking at quarry.288.5130.837735.8
Total Activity 976000
S.NoMaterialQuantityUnit PriceTotal
1contengency no11800018000
2hard shoulder compaction148.539.65880.6
3Moorum5.0253501758.75
4Rolling of Muram167906790
5Rolling of Soil11000010000
6Transportation of embankment s1316.5563.2783298.1185
7Transportation of Muram688.5350240975
8Transportation of Water3766.5622599
Total Material 390000