State: MADHYA PRADESH District: BHIND Block: ATER Panchayat: UDOTHGARAH
Work Code: 1702001002/RC/433 (सीसी रोड रामजानकारी मंदिर से बलवीर सिंह के मंदिर क)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2012-2013 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 21/5/2012 Work start date : 21/5/2012
Present status : No Road Proposed Status : Cement Concrete
Tech Sanction Details
Technical Sanction No. : 141 Sanction Date : 12/9/2012
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Panchparmeshwar scheme2 scheme3 Total
86100 57400 0 0 282500 0 0 340000 0 426000
Financial Sanction Details
Financial\Administrative Sanction No: 9911 Financial\Administrative Sanction Date 29/10/2012
Fin. Sanc. Amt. (in Rs) NREGA:143500 Panchparmeshwar
282500
Scheme 2
0
Scheme 3
0
Total
426000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1signboard125002500
2Contingency11722417224
3Dag-beling-Double spade "v" shaped stroke 100mm deep5190.4207.6
4Filling in plinth with sand under floors including watering, ramming, consolidating and dressing complete.88.057378.633338.3802
5Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal)94.9772511.5238534.7355
6False work for R.C.C. and P.C.C. work in plinth and foundation150129.619440
7Providing and filling in position blown bitumen in expansion joints (10cm deep and 1cm Wide)307.945.81786.052
8Transportation charges of water for every additional 200m or part thereof, beyond initial lead of 200m up to 2 Km. Lead for 129672967
9Transportation of 20 MM metal80.739713.657615.3504
10Transportation of sand13872438724
11Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed -Dense or hard soil for Road Work105.35767.87143.2046
12Labour difference in case of old SoR652106520
Total Activity 426000
S.NoMaterialQuantityUnit PriceTotal
1Cement22026057200
2Convergence Amount1282500282500
Total Material 340000