S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Labour only for item no.0406 | 0 | 0 | 0 |
2 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal) | 7.39 | 3357.9 | 24814.881 |
3 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal) | 9.34 | 2484 | 23200.56 |
4 | False work for R.C.C. and P.C.C. work in plinth and foundation | 158.22 | 144.6 | 22878.612 |
5 | Providing and placing in position tested steel for R.C.C. work including cutting, bending, binding etc. as per drawings and placing in position complete up to floor two level including cost of binding wire and all wastage etc. complete.-Mild steel and Medium tensile steel bars | 464.39 | 50.1 | 23265.939 |
6 | Add in item No. 2402 for lift. (In well excavation)-For every 0.50 m after 1.5 m initial depth upto 6.0 m | 84.78 | 598 | 50698.44 |
7 | Add in item No. 2402 for lift. (In well excavation)-For every 0.50 m after 6.0 m initial depth upto 10.5 m | 104.77 | 696.39 | 72960.7803 |
8 | Add in item No. 2402 for lift. (In well excavation)-For every 0.50 m after 10.5 m initial depth upto 18.0 m | 151.25 | 898.1 | 135837.625 |
9 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.Hard moorum for Well Work | 97.44 | 133.7 | 13027.728 |
10 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal or stacking of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.Disintegrated or soft rock (not requiring blasting) for Well Work | 47.55 | 414.8 | 19723.74 |
11 | contingency | 13606 | 1 | 13606 |