State: MADHYA PRADESH District: DHAR Block: BADNAWAR Panchayat: Bakhatgarh
Work Code: 1722001033/DW/9993657636 (सार्वजनिक कूप कोड रोड पर मोग्या खली के पास )
Work Category: Drinking Water
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2015-2016 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 1/11/2015 Work start date : 15/2/2016
Present status : Not Exist Proposed Status : DUGWELLS
Tech Sanction Details
Technical Sanction No. : 2479 Sanction Date : 30/1/2016
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
191571.24 208443.18 0 0 0 0 0 209000 0 400014.42
Financial Sanction Details
Financial\Administrative Sanction No: 158/33 Financial\Administrative Sanction Date 31/1/2016
Fin. Sanc. Amt. (in Rs) NREGA:400014 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
401000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Labour only for item no.0406000
2Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal)7.393357.924814.881
3Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal)9.34248423200.56
4False work for R.C.C. and P.C.C. work in plinth and foundation158.22144.622878.612
5Providing and placing in position tested steel for R.C.C. work including cutting, bending, binding etc. as per drawings and placing in position complete up to floor two level including cost of binding wire and all wastage etc. complete.-Mild steel and Medium tensile steel bars464.3950.123265.939
6Add in item No. 2402 for lift. (In well excavation)-For every 0.50 m after 1.5 m initial depth upto 6.0 m84.7859850698.44
7Add in item No. 2402 for lift. (In well excavation)-For every 0.50 m after 6.0 m initial depth upto 10.5 m104.77696.3972960.7803
8Add in item No. 2402 for lift. (In well excavation)-For every 0.50 m after 10.5 m initial depth upto 18.0 m151.25898.1135837.625
9Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.Hard moorum for Well Work97.44133.713027.728
10Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal or stacking of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.Disintegrated or soft rock (not requiring blasting) for Well Work47.55414.819723.74
11contingency13606113606
Total Activity 401000
S.NoMaterialQuantityUnit PriceTotal
120 M.M. METAL8.4624.615246.724
240 M.M. METAL6.29408.82571.352
3Blasting340.8365.41124531.728
4Cement8530025500
5false (work) (sentring)158.2273.511629.17
6IRON SARIYA464.3945.120943.989
7PhotoCopy & Stationary13481113481
8Sand7.38615.074539.2166
Total Material 209000