S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Extra for every additional lift of 1.5 m or part there of-Loose/soft soil and dense/hard soil | 2422.88 | 10.7 | 25924.816 |
2 | 22cm thick dry stone pitching (without quarry spalls) with individual stone of 22cm depth and minimum size 0.014 | 63 | 260.4 | 16405.2 |
3 | Lossening of hard soil by ploughing the existing gound | 5227.6 | 2.7 | 14114.52 |
4 | Lossening of hard soil by ploughing the existing goundSpreading, dressing , breaking of clods of ploudged earth upto 20 m, lead and lift upto 1.5 mt, disposed soil to be leveled and neatly dressed | 5227.6 | 50 | 261380 |
5 | work charge | 1 | 15891.2 | 15891.2 |