State: MADHYA PRADESH District: GWALIOR Block: BHITARWAR Panchayat: MAUCHH(P)
Work Code: 1703004062/IF/9993698845 (pasu shed navav singh s/o devi singh)
Work Category: Drought Proofing
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2015-2016 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Perspective Plan :
Proposal Date : 2/10/2015 Work start date : 22/12/2015
Present status : Existing Proposed Status : Cattle Shed
Tech Sanction Details
Technical Sanction No. : 062/2565 Sanction Date : 16/11/2015
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
33474 27762 0 0 0 0 0 27800 0 61236
Financial Sanction Details
Financial\Administrative Sanction No: *12 Financial\Administrative Sanction Date 25/11/2015
Fin. Sanc. Amt. (in Rs) NREGA:61236 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
61300
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Contingency139123912
2Earth work in excavation in trenches for foundations and for pipes, cables etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including getti-Dense or hard soil16.63670.61174.5016
3Filling foundation and around masonry work with moorum I/c ramming layers and watering.6.0705145.4882.6507
4Filling foundation or under floor with 40mm gauge graded metal and moorum including ramming in layers and watering.2.416809.91956.7184
5Providing and laying damp proof course 50mm thick with C.C.1:2:4 with 20mm size graded stone aggregate. including curing.26.695188.65034.677
6Random / uncoursed rubble masonry in plinth and foundation with mud mortar including levelling at plinth level.16.569940.315579.8307
7Random / uncoursed rubble masonry in plinth and foundation including levelling up with cement concrete 1:6:12 (1cement, 6coarse sand, 12 aggregate 20mm nominal size) at plinth level.-In Cement mortar 1:8 (1cement, 8sand)10.05431645.316542.33979
8Pointing on CR masonry with cement mortar 1:4(1cement, 4sand)-Ruled pointing48.3461.22958.408
9Second class brick flooring laid dry grouted with C.M. 1:6 i/c finishing the joints flush.21.681263.65715.1116
10Transportation of sand166.45642.287037.75968
11Earth work in excavation in trenches for foundations and for pipes,cables etc.not exceeding 1.5 m in width and for shafts,cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including gettin-Dense or hard soil588.3441.5
Total Activity 61300
S.NoMaterialQuantityUnit PriceTotal
120 M.M. B.T. METAL136.92.42331.298
240 M.M. METAL (cum)13650.991351.35
3BRICK1404560
4CEMENT (Beg)212705670
5Contangancy120011200
6MURROM6.85123842.55
7SAND4.98204018
8Transpotation Charges26.62517.9513787.829
Total Material 27800