Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 26-Jun-2024 04:24:02 AM 
Back  
State: MADHYA PRADESH District: BHIND Block: ATER Panchayat: KYARIPURA
Work Code: 1702001070/RC/22012034191416 (C.C. Bade lal ke ghar se gulad ke or)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2013-2014 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 14/4/2013 Work start date : 3/11/2013
Present status : Earthern road Proposed Status : Cement Concrete
Tech Sanction Details
Technical Sanction No. : 43/70 Sanction Date : 2/5/2013
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Panchparmeshwar scheme2 scheme3 Total
74700 49800 0 0 271500 0 0 322000 0 396000
Financial Sanction Details
Financial\Administrative Sanction No: 19/70 Financial\Administrative Sanction Date 2/10/2013
Fin. Sanc. Amt. (in Rs) NREGA:124500 Panchparmeshwar
271500
Scheme 2
0
Scheme 3
0
Total
396000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1signboard137503750
2Contingency11703217032
3Dag-beling-Single spade stroke minimum 75mm deep4500.4180
4Filling in plinth with sand under floors including watering, ramming, consolidating and dressing complete.76.35456.434846.14
5False work for R.C.C. and P.C.C. work in plinth and foundation130.05121.815840.09
6Providing and filling in position blown bitumen in expansion joints (10cm deep and 1cm Wide)26761602
7Cutting out cracks of roof terrace to V-Section, cleaning out wetting, grouting with cement and sand slurry 1:3 (1 cement, 3 sand)82.352843.3234145.755
8Transportation charges of water for every additional 200m or part thereof, beyond initial lead of 200m up to 2 Km. Lead for 76.355.2397.02
9Transportation charges of water for every additional 200m or part thereof, beyond initial lead of 200m up to 2 Km. Lead for 82.3529.22404.62
10Transportation rates for Masonry stone.70.005719.150340.5955
11Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.91.3573.46705.09
12Labour difference in case of old SoR12829928299
Total Activity 396000
S.NoMaterialQuantityUnit PriceTotal
1CEMENT(BEGS)18826549820
2complite materail punch parmes1271500271500
Total Material 322000