S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | signboard | 1 | 2000 | 2000 |
2 | Contingency | 1 | 1300 | 1300 |
3 | Work charge | 97 | 100 | 9700 |
4 | Filling in plinth with sand under floors including watering, ramming, consolidating and dressing complete. | 30 | 790.3 | 23709 |
5 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal) | 9.6 | 3474.1 | 33351.36 |
6 | Steel work welded in built up sections, framed work, including cutting hoisting fixing in position in gratings, frames, guard bars, ladders, railing, brackets and similar works & trusses and trussed purlins up to 25m span and 15 m over all height | 70 | 75.5 | 5285 |
7 | Providing and fixing fencing consisting 5 horizontal and 2 diagonals rows of G.I Barbed Wire(minimum weight 9.38 Kg/100mt. As per IS 278:1962 Type 1), M.S. angle iron post 50x50x6mm (confirming to I.S. 225) 1.50 metre height above ground level and 0.30 m | 100 | 368.3 | 36830 |
8 | Earth work in rough excavation,filling excavated earth into depressions on banking as directed ,top surface to be levelled and neatly dressed.-Dense or hard soil | 180 | 97.6 | 17568 |