Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 27-Sep-2024 04:28:15 PM 
Back  
State: MADHYA PRADESH District: GWALIOR Block: BHITARWAR Panchayat: RICHHARIKHURD(P)
Work Code: 1703004070/RC/22012034292564 (Kharanja Nirman Sawai Kori ke makan se Pancham ke Ghar Hote Huye Main road ki or )
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2015-2016 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 2/10/2015 Work start date : 5/12/2015
Present status : Kharanja(Brick/Stone) Proposed Status : Kharanja (Brick/Stone)
Tech Sanction Details
Technical Sanction No. : 70/3158 Sanction Date : 18/11/2015
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
633113 206588 0 0 0 0 0 207000 0 839701
Financial Sanction Details
Financial\Administrative Sanction No: 70/34 Financial\Administrative Sanction Date 22/11/2015
Fin. Sanc. Amt. (in Rs) NREGA:839700 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
840000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1signboard150005000
2Dag-beling-Single spade stroke minimum 75mm deep9600.3288
3Hammer dressed 15cm thick stone paving laid in camber in moorum bedding and filled with moorum mortar.2160226.1488376
4Transportation rates for Masonry stone.307.8358.55110361.69
5Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars.50412563000
6Loading of metal in truck, dumper etc.50428.2614243.04
7Unloading of metal in truck, dumper etc.50414.137121.52
8Labour only for moorum, kankar, shingle/ gravel/red bajri spreading levelling to gradient and required camber including dressing.43244.119051.2
9Collection of hard moorum including stacking at quarry.504140.770912.8
10Preparation of sub grade by excavating earth work to the 15cm average depth, dressing to camber including making good the undulations etc. and disposal of surplus earth with lead upto 20metres and upto 1.5metre.-Dense or hard soil.240013.833120
11contingency128226.628226.6
Total Activity 840000
S.NoMaterialQuantityUnit PriceTotal
1contangency128226.628226.6
2Display board150005000
3PhotoCopy & Stationary1100100
4खण्‍डा परिवहन307.8358.55110361.69
5मुरम परिवहन (1)50412563000
Total Material 207000