Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 25-Jun-2024 10:56:09 AM 
Back  
State: MADHYA PRADESH District: GWALIOR Block: BHITARWAR Panchayat: SYAU(P)
Work Code: 1703004084/WC/22012034624357 (Loose bolder check Dam Nirman Chandrabhan Singh Rawat Ke Khet Ke Pas Syau)
Work Category: Water Conservation
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2020-2021 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : No Perspective Plan : No
Proposal Date : 26/1/2021 Work start date : 19/3/2021
Present status : Existing Proposed Status : Constr of Boulder Anicut Check Dam for Community
Tech Sanction Details
Technical Sanction No. : 1703004/2020-2021/95768/TS Sanction Date : 15/3/2021
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
418297.47 213440.67 633.59 79141.95 0 0 0 294000 0 711513.68
Financial Sanction Details
Financial\Administrative Sanction No: 1703004/2020-2021/95768/AS Financial\Administrative Sanction Date 17/3/2021
Fin. Sanc. Amt. (in Rs) NREGA:711802 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
712000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared.34306.5419475218658922438.88
2(a) C.C. 1:2:4 (1cement, 2sand, 4metal)27.63816.21847826087105327.63
3Labour only for dressing stones hammer or rough dressed for C. R. masonry work second sort.198.38504.148099606815100012.9
4Collection of rubble masonry (size 0.014cum to 0.06cum) other then black trap, basalt or granite.198.38636.994908760964126367.05
5(c) Masonry stones, pitching stones or boulders198.3843.47565278757948624.7
6(XV) 10 Km. Lead198.38267.99712672648553165.27
7b (iii) Dense or hard soil for Tank Work2178134.187502295684292260.38
8Citizen Information Board Size 0.9 Meter x 1.2 Meter ( Community Works )13603.483603.48
Total Activity 712000
S.NoMaterialQuantityUnit PriceTotal
10002-Hire charges of Concrete Mixer 0.25 to 0.40 cum with Hopper2.778852451.45
20297-Stone Aggregate(single size): 10 mm nominal size3.0366301912.68
30367-Portland Cement9.1369551150353.4559
40368-White cement 0.0004157446.2976
50983-Fine sand (zone IV)12.4671076.2513417.60875
67900-Modular common burnt clay bricks of class designation 7.5244.44.131009.372
7MR6001-Stone Aggregate(single size): 40 mm nominal size other than BT14.4175257568.925
8MR6032-Snowcem/ durocem0.00072778919.4523
9MR6034-Blaster (Semi-Skilled)1.9838351696.3138
10MR6035-Gelatine (80%)37.691365.62472.54928
11MR6036-Electric detonator198.37516.43253.35
12MR6037-Fuse coil (10m long)59.51258.2488.0025
13MR6038-Drilling of holes 25mm dia 0.75m deep148.781361.519151.537763
14MR6082-Stone Aggregate (Metal) 20mm nominal size (BT Metal) (Rate at quarry)6.0966824157.472
Total Material 97000