The Mahatma Gandhi National Rural Employment Guarantee Act 26-Jun-2024 05:17:03 PM 
Back  
State: MADHYA PRADESH District: DAMOH Block: JABERA Panchayat: KORATA
Work Code: 1711006051/WC/22012034561732 (gabion sturcture nirman/prem sankar ke khet ke pass/pipariya/korta)
Work Category: Water Conservation
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2020-2021 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 14/4/2020 Work start date : 17/6/2020
Present status : Non-existent Proposed Status : Constr of Gabion Anicut for Community
Tech Sanction Details
Technical Sanction No. : 1711006/2020-2021/226099/TS Sanction Date : 24/6/2020
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
65100.86 67380.99 6415.5 6064.67 0 0 0 79900 0 144962.02
Financial Sanction Details
Financial\Administrative Sanction No: 1711006/2020-2021/226099/AS Financial\Administrative Sanction Date 24/6/2020
Fin. Sanc. Amt. (in Rs) NREGA:145250 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
146000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Steel work welded in built up sections, framed work, including cutting hoisting fixing in position in gratings, frames, guard bars, ladders, railing, brackets and similar works & trusses and trussed purlins up to 25m span and 15 m over all height474.685.138664138221740406.81
2(VI) 3.0 Km. Lead97.9139.21348314606713629
3(a) Boulders97.9566.35035750766155445.7
4b (iii) Dense or hard soil for Tank Work15.4134.1876623376622066.49
5c (iii) Hard moorum for Tank Work19.25178.7376623376623440.7
6a (i) Disintegrated or soft rock (not requiring blasting) for Tank Work19.25567.18337662337710918.28
7Collection of boulders at source (maximum size 0.014cum) without quarrying i.e. picked up boulders.97.9161.02502553626115764.35
8Citizen Information Board Size 0.9 Meter x 1.2 Meter ( Community Works )13578.363578.36
Total Activity 146000
S.NoMaterialQuantityUnit PriceTotal
10002-Hire charges of Concrete Mixer 0.25 to 0.40 cum with Hopper0.018858.85
20084-Hire charges of Diesel truck - 9 tonne (without POL)3.286322427367.8846
30367-Portland Cement0.02895511159.2679
40368-White cement 0.0004157446.2976
50983-Fine sand (zone IV)0.0471076.2550.58375
61004-Average rate of mild steel round bars for reinforcements1.828751929494.6104
71008-Flats up to 10 mm in thickness3.2656472015413.632
81215-Welding by electric plant1306.23851.181541.36143
91235-Diesel oil27.4409681865.9812
105001-Mobil oil0.9859182.9180.32111
117900-Modular common burnt clay bricks of class designation 7.5244.44.131009.372
12MR6001-Stone Aggregate(single size): 40 mm nominal size other than BT0.06552534.125
13MR6032-Snowcem/ durocem0.00072778919.4523
14MR6082-Stone Aggregate (Metal) 20mm nominal size (BT Metal) (Rate at quarry)0.02468216.368
15MR6101-Boulder - picked up (1807)97.914714391.3
Total Material 51600