Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 25-Jun-2024 11:24:40 AM 
Back  
State: MADHYA PRADESH District: GWALIOR Block: BHITARWAR Panchayat: PURABANWAR(P)
Work Code: 1703004045/RC/1308 (KHARANJA NIRMAN BEEJ GODAM SE ANGABADI KI OR)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2010-2011 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 1/4/2010 Work start date : 2/4/2010
Present status : No Road Proposed Status : Kharanja (Brick/Stone)
Tech Sanction Details
Technical Sanction No. : 275/13 Sanction Date : 28/12/2010
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
335855 156894 0 0 0 0 0 157000 0 492749
Financial Sanction Details
Financial\Administrative Sanction No: 4/13 Financial\Administrative Sanction Date 1/1/2011
Fin. Sanc. Amt. (in Rs) NREGA:492749 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
493000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Dag-beling-Single spade stroke minimum 75mm deep7000.2140
2Providing and fixing in cement mortar 1:6 (1cement, 6sand) flag stone slab over drains.-30 mm thick490218.6107114
3Hammer dressed 15cm thick stone paving laid in camber in moorum bedding and filled with moorum mortar.1050215.7226485
4Transportation rates for Masonry stone.157.5206.6432545.8
5Transportation rates for Bricks, kanker, stone chips shingle & excavated materials in disintegrated rock & soft rock.244.72132.8432508.6048
6Loading of metal in truck, dumper etc.244.7226.286431.2416
7Unloading of metal in truck, dumper etc.244.7213.143215.6208
8Labour only for moorum, kankar, shingle/ gravel/red bajri spreading levelling to gradient and required camber including dressing.244.724110033.52
9Collection of hard moorum including stacking at quarry.244.72130.832009.376
10Preparation of sub grade by excavating earth work to the 15cm average depth, dressing to camber including making good the undulations etc. and disposal of surplus earth with lead upto 20metres and upto 1.5metre.-Dense or hard soil.129512.816576
11contingency125689.5425689.54
Total Activity 493000
S.NoMaterialQuantityUnit PriceTotal
1contangency125689.5425689.54
2Transperancy Board157.5206.6432545.8
3पत्‍थर फर्सी49013566150
4मुरम परिवहन (1)244.72132.8432508.6048
Total Material 157000