S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 40000 | 4.2168 | 168672 |
2 | Digging of planting pits for plantation work, sizes as per plant specification and plant height : | 227.81 | 55.1998156358369 | 12575.07 |
3 | Providing and filling pits with locally available Firm Yard Manure (FYM) as per planting specification : | 2500 | 31.33 | 78325 |
4 | Providing and spraying bio pesticides/ fungicides such as Neem Oil as per planting specification : | 2500 | 24.455 | 61137.5 |
5 | Filling of excavated earth in planting pit in layers not exceeding 20 cm in depth consolidating each deposited layers by ramming watering etc., : | 227.81 | 65.0499978051885 | 14819.04 |
6 | Cost of Planting of Mangifera Indica (Mango Grafted ) of height 60-75 cm at a spacing of not less than 4.5 X 4.5 m with pit size as per plant specification and types : | 2500 | 65 | 162500 |