State: MADHYA PRADESH District: HARDA Block: HARDA Panchayat: DAGAWANSHANKAR
Work Code: 1743002026/RC/256 (grem Gogeramafi to gogle roed )
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2008-2009 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 1/4/2008 Work start date : 1/3/2009
Present status : Earthern road Proposed Status : Gravel Road
Tech Sanction Details
Technical Sanction No. : 1467/1 Sanction Date : 9/4/2008
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
339000 156000 0 0 0 0 0 156000 0 495000
Financial Sanction Details
Financial\Administrative Sanction No: .1 Financial\Administrative Sanction Date 28/3/2009
Fin. Sanc. Amt. (in Rs) NREGA:495000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
495000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Site clearance, cutting grass, raking into heaps and removing off the premises45000.753375
2Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Hard moorum2845.837.83107656.614
3Dag-beling-Single spade stroke minimum 75mm deep13500.14189
4Collection of approved soil having CBR not less then 12, including stacking at quarry.278.4370.0519504.0215
5Transportation charges of water for every additional 200m or part thereof, beyond initial lead of 200m up to 2 Km. Lead for 278.435.121425.5616
6Transportation charges of water for every additional 200m or part thereof, beyond initial lead of 200m up to 2 Km. Lead for 2845.85.1214570.496
7Transportation of metal 256158.8150586.8
8Transportation of metal 278.4366.3118462.6933
9Labour only for moorum, screening or binding material as per MOST 2004 clause 400.2.6 spreading on boulder or WBM coat as per MOST 2004 clause 404.2.72839.4324.1468543.8402
10Rolling & Compaction of granular sub-base of well graded material, spreading in uniform layers with tractor mounted grader on prepared surface, mixing by mix in place, sprinkling of water till OMC, and compacting with smooth wheel rollers of 80 to 100 kN3124.2320.9365390.1339
11contingency12857.143.544999.99
12Earth work in excavation in foundation including all leads and lifts including rough dressing and breaking clods deposited the excavated materials away from work site.000
Total Activity 495000
S.NoMaterialQuantityUnit PriceTotal
1contigency8571.423.529999.97
2Rolling Earth & moorum256135.8591811.85
3Transportanion of Soft Muram2845.83.710529.46
4Transportation charges000
5Transportation of GSB278.4347.21813146.90774
6Transportation of Water2845.83.5810187.964
Total Material 156000