State: MADHYA PRADESH District: BHIND Block: ATER Panchayat: SURPURA
Work Code: 1702001069/OP/9425888215 (Cattle protection wall thana campus surpura)
Work Category: Other Works
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2015-2016 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 15/8/2015 Work start date : 25/11/2015
Present status : Not Exist Proposed Status : Maintenance of rural public assets
Tech Sanction Details
Technical Sanction No. : 325o Sanction Date : 9/11/2015
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
258000 411000 0 0 0 0 0 411000 0 669000
Financial Sanction Details
Financial\Administrative Sanction No: 3/325 Financial\Administrative Sanction Date 17/11/2015
Fin. Sanc. Amt. (in Rs) NREGA:669000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
669000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20cm in depth consolidating each deposited layers by ramming and watering lead upto 50m and lift upto 1.5m88393432
2Filling foundation or under floor with 40mm gauge graded metal and moorum including ramming in layers and watering.13.6588212039.3
3Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal)1.653194.25270.43
4Providing and placing in position RCC for roof, beams, columns column footing lintels chhajjas, balcony, stairs etc, excluding cost of reinforcement & centring but including finishing & curing.-CC 1:1.5:3 (1cement, 1.5sand, 3graded stone aggregate 20 mm nominal size)32.223460.2111487.644
5False work for lintels slabs, columns, walls, sills, chhajjas balconies, beams, stair cases or ornamental moulded work, curved surface etc. cast in situ including all lead and lift119195.423252.6
6False work for R.C.C. and P.C.C. work in plinth and foundation142132.518815
7Class 25 open bhatta or pajawa burnt brick masonry in plinth and foundation.-Cement mortar 1:6 (1cement, 6sand)582849.4165265.2
8Providing and placing in position tested steel for R.C.C. work including cutting, bending, binding etc. as per drawings and placing in position complete up to floor two level including cost of binding wire and all wastage etc. complete.-Mild steel and Medium tensile steel bars177050.889916
915mm thick cement plaster on rough side of wall in-Cement mortar 1:4 (1cement, 4sand)50299.449898.8
10Colour washing 2 coats over and including a primary coat of white washing on undecorated wall surface.66810.36880.4
11Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars.11400014000
12Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed -Dense or hard soil for Road Work153688.4135782.4
13Earth work in excavation in trenches for foundations and for pipes,cables etc.not exceeding 1.5 m in width and for shafts,cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including gettin-Loose or soft soil11096.210582
14contingency12200022000
Total Activity 669000
S.NoMaterialQuantityUnit PriceTotal
120 M.M. B.T. METAL42.5140059500
2Bricks290004116000
3CEMENT (Beg)32128089880
4Centering and Shuttering130003000
5Contagecny110001000
6Distemper100505000
7IRON GATE 2150005000
8Lime Powder100101000
9SAND (RATE)36120043200
10steel bar (10 mm)17704579650
11Transpotation Charges170007000
12Treanportesion Charges070000
Total Material 411000