S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Site clearance, cutting grass, raking into heaps and removing off the premises | 115 | 26.4 | 3036 |
2 | Extra for every additional lift of 1.5 m or part there of-Loose/soft soil and dense/hard soil | 1683.38 | 10.7 | 18012.166 |
3 | 22cm thick dry stone pitching (without quarry spalls) with individual stone of 22cm depth and minimum size 0.014 | 276.35 | 260.4 | 71961.54 |
4 | Lossening of hard soil by ploughing the existing gound | 3681.76 | 2.7 | 9940.752 |
5 | Lossening of hard soil by ploughing the existing goundSpreading, dressing , breaking of clods of ploudged earth upto 20 m, lead and lift upto 1.5 mt, disposed soil to be leveled and neatly dressed | 3681.76 | 50 | 184088 |