Work Code: 1725001035/IF/728 (कपिलधारा सवाईसिंग दलपत)
Work Category: Drought Proofing
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2012-2013 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Perspective Plan :
Proposal Date : 1/4/2012 Work start date : 15/4/2012
Present status : Not Exist Proposed Status : Well
Tech Sanction Details
Technical Sanction No. : 000102/2012 Sanction Date : 1/4/2012
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
123000 82000 0 0 0 0 0 82000 0 205000
Financial Sanction Details
Financial\Administrative Sanction No: 00001/2012 Financial\Administrative Sanction Date 2/4/2012
Fin. Sanc. Amt. (in Rs) NREGA:205000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
205000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Loose or soft soil356.9286.2530784.35
2Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Dense or hard soil268.194211263.98
3Extra rates for quantities of work executed. In or under water or in foul condition (extra rate for the main item concerned is allowed on account of slow progress of works)465020.29300.4
4Extra for every additional Lead beyond 50metres or part thereof upto 200 m for every 50 m lead140.6318.32573.529
5Providing and placing in position RCC for roof, beams, columns column footing lintels chhajjas, balcony, stairs etc, excluding cost of reinforcement & centring but including finishing & curing.-CC 1:2:4 (1cement, 2sand, 4graded stone aggregate 20 mm nominal size)6.332557.616189.608
6False work for R.C.C. and P.C.C. work in plinth and foundation127128.616332.2
7Providing and placing in position tested steel for R.C.C. work including cutting, bending, binding etc. as per drawings and placing in position complete up to floor two level including cost of binding wire and all wastage etc. complete.-Mild steel and Medium tensile steel bars17851.79202.6
8Stacking and boxing.-Moorum or sand4.512.656.7
9Transportation of metal 12.12134.11625.292
10Transportation of metal 5.38125.4674.652
11Transportation of metal 1.39112.86156.8754
12Transportation of metal 0.18112.8620.3148
13FOR EARTHEN DAM - Providing fitter blanket, horizontally, including laying, Spreading, packing etc. in layers of required thickness but excluding excavation of foundation.-Metal 80 mm nominal size4.5125.7565.65
14FOR EARTHEN DAM - Construction of rock toe in earthen embankments including laying and hand packing, dressing, wedging and finishing over surface with.-Boulders13.52783753
15Earth work for well excavation including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Loose or soft soil22.6775.31707.051
16Earth work for well excavation including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Dense or hard soil9.967.8671.22
17Earth work for well excavation including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Hard Moorum31.1393.382906.9194
18Earth work for well excavation including disposal or stacking of excavated soil lead upto 50m lift upto 1.5m-Disintegrated or soft rock (not requiring blasting)59.14216.6812814.4552
19Earth work for well excavation including disposal or stacking of excavated soil lead upto 50m lift upto 1.5m-Hard rock requiring blasting.202.7412.49683612.9392
Total Activity 205000
S.NoMaterialQuantityUnit PriceTotal
120 M.M. METAL6.669506327
2Blasting (No)16010016000
3Cement(bori)5030015000
4Centering and Shuttering851008500
5CONTANGANCY11000010000
6deasil pump96005400
7MASON (PERDAY)123003600
8Photocopy & staionary115001500
9Plants1050500
10Sand3.512004200
11STEEL160508000
12Transpotation Charges129002900
Total Material 82000