S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | (a) Dense or hard soil (PT/60/60) | 70.2 | 159.736894586895 | 11213.53 |
2 | Loosing of hard soIl such as moorum etc. By ploughing (tractor ect.) the existing ground exceeding 30cm in depth as well as 10 sqm on plan including all running expanses of machine. | 281.25 | 3.60017777777778 | 1012.55 |
3 | Spreading dressing, breaking of clods of ploughed earth upto 20m lead and lift upto 1.5m disposed soil to be leveled and neatly dressed. | 281.25 | 73.6689422222222 | 20719.39 |
4 | Citizen Information Board Size 0.9 Meter x 1.2 Meter ( Community Works ) | 1 | 3578.36 | 3578.36 |
5 | Filling dug pits with manure/compost for dug-pit size 0.60x0.60x0.60 m (using Manure and Excavated earth for filling) | 325 | 11.978 | 3892.85 |
6 | (VIII) Anar plant (layering) | 325 | 38.194 | 12413.05 |
7 | (I) In First Year (only in case of survival more than 85%) | 250 | 203.39888 | 50849.72 |
8 | (II) In second Year ((only in case of survival more than 95%) | 250 | 145.95532 | 36488.83 |
9 | (III) In third year (only in case of 100% survival) | 250 | 85.83932 | 21459.83 |
10 | (I) 0 to 10 km | 325 | 1.25 | 406.25 |
11 | Deduct if filling the dug pit in any year except first year | -25 | 0 | 0 |