S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | signboard | 1 | 3603.34 | 3603.34 |
2 | Site clearance, cutting grass, raking into heaps and removing off the premises | 6.54 | 9000 | 58860 |
3 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Dense or hard soil | 1693.68 | 234.34 | 396896.9712 |
4 | Earth work in excavation in trenches for foundations and for pipes, cables etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including getti-Dense or hard soil | 120 | 173.8 | 20856 |
5 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal) | 90.5 | 3162.89 | 286241.545 |
6 | 22cm thick dry stone picked up boulder pitching i/c picking of boulder with individual size of 22cm depth. | 525 | 138.96 | 72954 |
7 | Collection of boulders at source (maximum size 0.014cum) without quarrying i.e. picked up boulders. | 310.5 | 289.85 | 89998.425 |
8 | Transportation of metal | 1650 | 89.44 | 147576 |
9 | Add if Lead is more than 5.00Km-For every 0.5 Kms. Lead beyond 10 Kms. and part there of upto 30 Kms. | 310.5 | 114.28 | 35483.94 |
10 | Lossening of hard soil by ploughing the existing gound | 5000 | 3.6 | 18000 |
11 | Lossening of hard soil by ploughing the existing goundSpreading, dressing , breaking of clods of ploudged earth upto 20 m, lead and lift upto 1.5 mt, disposed soil to be leveled and neatly dressed | 4512 | 73.67 | 332399.04 |