Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 28-Sep-2024 01:14:24 AM 
Back  
State: MADHYA PRADESH District: SHAJAPUR Block: MOMAN BADODIYA Panchayat: PACHOR
Work Code: 1719006081/RC/22012034211996 (cc road pp nrega jagdish to devkaran sodnakhedi)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2013-2014 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 26/1/2014 Work start date : 24/2/2014
Present status : No Road Proposed Status : Cement Concrete
Tech Sanction Details
Technical Sanction No. : 81/05 Sanction Date : 28/2/2014
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Panchparmeshwar scheme2 scheme3 Total
70400 46100 0 0 250000 0 0 297000 0 366500
Financial Sanction Details
Financial\Administrative Sanction No: 81/05 Financial\Administrative Sanction Date 1/3/2014
Fin. Sanc. Amt. (in Rs) NREGA:116500 Panchparmeshwar
250000
Scheme 2
0
Scheme 3
0
Total
367000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal)96.332442.8235314.924
2Labour only for item no. 0413 (for any proportion of cement concrete)96.33392.237780.626
3Add to item No. 0413 and 0415 if in place of 40mm metal.-If 20 mm graded metal is used96.33132.112725.193
4False work for R.C.C. and P.C.C. work in plinth and foundation85.5153.113090.05
5Deduct for concrete unvibrated in item no. 042585.515613338
6Transportation of metal 93.4850.674736.6316
7Add if Lead is more than 5.00Km-For every 0.5 Kms. Lead beyond 5 Kms. and part there of upto 10 Kms.43.35149.766492.096
8Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars.84.77166.414105.728
9Loading of metal in truck, dumper etc.93.4826.282456.6544
10Unloading of metal in truck, dumper etc.93.4813.141228.3272
11Labour only for moorum, kankar, shingle/ gravel/red bajri spreading levelling to gradient and required camber including dressing.93.48413832.68
12Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed -Dense or hard soil for Road Work101.4681.28238.552
13Collection of soft moorum including stacking at quarry.93.48112.810544.544
14contingency126002600
Total Activity 367000
S.NoMaterialQuantityUnit PriceTotal
11904 transportation of cement000
220 MM B.T.METAL84.7795080531.5
340 mm metal(1.3.6)000
4CEMENT(BEGS)569275156475
5Centering and Shuttering85.595.78182.35
6contengency 2114001400
7sand cum43.3580034680
8Transportaion of muram (trip)93.4850.674736.6316
9Vibrator (Per Day)1856010080
Total Material 297000