S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | (b) C.C. 1:3:6 (1cement, 3sand, 6metal) | 1.62 | 3125.19135802469 | 5062.81 |
2 | (b) CC 1:1.5:3 (1 cement, 1.5 sand, 3 graded stone aggregate 20mm nominal size) | 4.1 | 5704.14878048781 | 23387.01 |
3 | False work for R.C.C. and P.C.C. work in plinth and foundation. | 18.4 | 161.652717391304 | 2974.41 |
4 | (j) Cement mortar 1:6 (1cement, 6sand) | 3.95 | 3813.05316455696 | 15061.56 |
5 | Steel work welded in built up sections, framed work, including cutting hoisting fixing in position in gratings, frames, guard bars, ladders, railing, brackets and similar works & trusses and trussed purlins up to 25m span and 15 m over all height | 1687.6 | 84.5269021095046 | 142647.6 |
6 | (b) Cold twisted / Hot rolled deformed / Thermo mechanicaly treated steel bars | 150 | 71.5852666666667 | 10737.79 |
7 | (b) Cement mortar 1:4 (1cement, 4sand) | 13.5 | 105.999259259259 | 1430.99 |
8 | (b) 0.80 mm thick sheet. | 75.2 | 753.238829787234 | 56643.56 |
9 | (b) 0.80 mm thick sheet. | 6.4 | 504.9078125 | 3231.41 |
10 | (b) White cement | 13.5 | 28.2962962962963 | 382 |
11 | (b) 2 coats | 80 | 65.79 | 5263.2 |
12 | Site clearance, cutting grass, raking into heaps and removing off the premises | 150 | 2.432 | 364.8 |
13 | (a) Loose or soft soil | 19.73 | 82.8089204257476 | 1633.82 |
14 | Loosing of hard soIl such as moorum etc. By ploughing (tractor ect.) the existing ground exceeding 30cm in depth as well as 10 sqm on plan including all running expanses of machine. | 143.75 | 3.60020869565217 | 517.53 |
15 | Spreading dressing, breaking of clods of ploughed earth upto 20m lead and lift upto 1.5m disposed soil to be leveled and neatly dressed. | 143.75 | 68.2406956521739 | 9809.6 |