S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Excavation in earth for all sorts of soil & silt, lime, shadu, sand/ grit, such types of strata including dressing and conveying the excavated material by head and upto a distance of 10m and laying or spreading or filling in furrahas in layers of 30cm thick upto lift of 1:50m as directed. (A) Excavation - (In General) Rate for the area | 1646.579 | 116.025000926163 | 191044.33 |
2 | Excavation in earth for soft murum type of strata including dressing and converying the excavated material by head load upto a distance of 10m and laying or spereading or filling in furrahas in layers of 30cm. Thick upto a lift of 1.50m as directed. (A) Excavation - (In General) rate for the othe area | 549.171 | 146.327992556053 | 80359.09 |
3 | Additional rate of additional lead by head load for all kind of soil, sand, soft murum, hard murum, stones, pebbles,boulders, rock. (Additional lead of 10 m. in other area) | 1665.592 | 26.8631993909673 | 44743.13 |
4 | Constucting casing or Hearting at embankment site with the following sorts of materials conveyed, removing trees, bushes, grass roots, etc. breaking clods and spreading the same in layers for embankement with earth work and dressing upto required level. (A) For Soil, soft murum and hard murum and boulder materials. For General area. | 515.2 | 10.9199922360248 | 5625.98 |
5 | Extra rate of additional lift of 1.5 m and/or its part for conveying material obtained from all types of strata from pit / borrow area.
Additional lift 1.5 m in other area. | 676.25 | 65.9841035120148 | 44621.75 |
6 | Extra rate of additional lift of 1.5 m and/or its part for conveying material obtained from all types of strata from pit / borrow area.
Additional lift up to 3.00 m in other area. | 300.125 | 95.0040149937526 | 28513.08 |
7 | Constructing 15 cm to 23 cm thick hand laid, dry pitching with dry dubber/ stone weighing 15 kg to 20 kg available on the ground area at work site from already excavated area and filling voids with stone chips. (Rate is excluding the amount of stone chips)
For other area. | 45 | 106.743111111111 | 4803.44 |
8 | Man days for unskilled | 124.294 | 272.999983909119 | 33932.26 |
9 | Lum sum Material for all works. | 126545 | 1 | 126545 |