Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 27-Jun-2024 07:52:14 PM 
Back  
State: MADHYA PRADESH District: GWALIOR Block: BHITARWAR Panchayat: DAULATPUR(P)
Work Code: 1703004035/RC/22012034168184 (PULIYA NIRMAN DAULATPUR SE RAKRE CHAK PAHUNCH MARG)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2012-2013 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 26/1/2013 Work start date : 31/5/2013
Present status : Earthern road Proposed Status : Mitti Murram Road
Tech Sanction Details
Technical Sanction No. : 474 Sanction Date : 4/3/2013
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Performance Grant scheme2 scheme3 Total
185350 123568 0 0 264700 0 0 389000 0 573618
Financial Sanction Details
Financial\Administrative Sanction No: 035/94 Financial\Administrative Sanction Date 5/4/2013
Fin. Sanc. Amt. (in Rs) NREGA:573618 Performance Grant
0
Scheme 2
0
Scheme 3
0
Total
574000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1signboard150005000
2Contingency13256532565
3Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:4:8 (1cement, 4sand, 8metal)16.21874.730370.14
4Add to item No. 0413 and 0415 if in place of 40mm metal.-If 20 mm graded metal is used1.352837.883831.138
5Random / uncoursed rubble masonry in plinth and foundation including levelling up with cement concrete 1:6:12 (1cement, 6coarse sand, 12 aggregate 20mm nominal size) at plinth level.-In Cement mortar 1:6 (1cement, 6sand)81.581682.9137290.982
6Pointing on random rubble masonry or uncoursed stone masonry with cement mortar 1:4 (1cement, 4sand)-Raised and cut pointing117103.312086.1
7Transportation of 20 MM metal1.14275.46314.0244
8Add if Lead is more than 5.00Km-For every 0.5 Kms. Lead beyond 10 Kms. and part there of upto 30 Kms.14.74185.42732.796
9Transportation of sand42.83296.4612697.3818
10Transportation rates for Masonry stone.81.58385.5531453.169
11Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars.967.2166.86161386.992
12Transportation rates for Hume pipes (NP-2) 800 mm to 900 mm dia.10697.686976.8
13Providing and filling in foundation trenches and at the back of abutments, wing walls etc. and below pipe bed in layers not exceeding 15cm thick including watering and compacting including all lead and lifts.-Selected granular material in filling.2.25860.91937.025
14Providing and laying reinforced cement concrete pipes N.P.3 for culverts including pointing ends, and fixing collar with cement martar 1:2 complete.-900 mm dia.103154.631546
15Earth work in excavation in trenches for foundations and for pipes,cables etc.not exceeding 1.5 m in width and for shafts,cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including gettin-Dense or hard soil5479.94314.6
16Collection of soft moorum including stacking at quarry.967.210298654.4
Total Activity 574000
S.NoMaterialQuantityUnit PriceTotal
140 mm metal(1.3.6)14.745508107
2Cement28026875040
3contangency and work charges12620626206
4Display board150005000
5Gitti-20 mm1.149001026
6RCC NP3 Pipe 900MM103154.631546
7send42.8360025698
8Transportation of Muram967.2166.86161386.992
9Transpotation Charges15417254172
Total Material 389000