S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared. | 837.5 | 6.54194626865672 | 5478.88 |
2 | (a) Other then black trap Basalt or granite | 54.8 | 298.858394160584 | 16377.44 |
3 | (a) Consolidation of Moorum /earth work (rate for 1Cum. of Moorum /earth work) | 543.9 | 2.35125942268799 | 1278.85 |
4 | (XI) 6 Km. Lead | 54.8 | 261.068795620438 | 14306.57 |
5 | (XIV) 9 Km. Lead | 390 | 199.264128205128 | 77713.01 |
6 | (XXV) 30 Km. Lead | 350 | 366.695028571429 | 128343.26 |
7 | (III) 1.5 Km. Lead | 153.9 | 104.142949967511 | 16027.6 |
8 | (a) Boulders | 45 | 570.825111111111 | 25687.13 |
9 | For earthen dam - puddle filling of good clay including lead upto 20 meter including mixing, watering & kneading by tamping , ramming & laying etc. | 153.9 | 421.809096816114 | 64916.42 |
10 | Hearting, casing/cut off filling soil etc.
At optimum moisture content to achieve maximum dry density by mechanical sheep foot roller/ vibratory compacters including watering, required leads and lifts and material etc. complete. | 718.9 | 21.7465294199471 | 15633.58 |
11 | a (iii) Loose or soft soil for Tank Work | 35.78 | 99.3921185019564 | 3556.25 |
12 | b (iii) Dense or hard soil for Tank Work | 175 | 134.187485714286 | 23482.81 |
13 | c (iii) Hard moorum for Tank Work | 430.95 | 178.737742197471 | 77027.03 |
14 | a (i) Disintegrated or soft rock (not requiring blasting) for Tank Work | 48.6 | 568.948148148148 | 27650.88 |