S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | signboard | 1 | 1000 | 1000 |
2 | Filling foundation and around masonry work with moorum I/c ramming layers and watering. | 7 | 131.4 | 919.8 |
3 | Filling foundation or under floor with 40mm gauge graded metal and moorum including ramming in layers and watering. | 7.5 | 732.3 | 5492.25 |
4 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal) | 0.48 | 2353.7 | 1129.776 |
5 | Class 25 open bhatta or pajawa burnt brick masonry in plinth and foundation.-Cement mortar 1:6 (1cement, 6sand) | 6.45 | 1862.3 | 12011.835 |
6 | Add for masonry in supper structure above plinth level up to floor two level | 5.26 | 124.3 | 653.818 |
7 | Steel work in single section including in cutting, hoisting fixing in position in R.S. joists, channels, angles, tee. | 118.4 | 53.4 | 6322.56 |
8 | Providing and fixing steel glazed doors, windows and ventilator of standard Rolled steel sections without horizontal glazing bars, joints mitred and welded with 16X3.15mm lugs 10cm long, embedded in cement concrete block 1:3:6 cement concrete with 20mm gr-Steel doors, windows side hung & ventilator top/ central hung. | 2 | 1171.2 | 2342.4 |
9 | 15mm thick cement plaster on rough side of wall in-Cement mortar 1:4 (1cement, 4sand) | 50.12 | 96.1 | 4816.532 |
10 | Providing corrugated C.I. sheet of class III roofing fixed with galvanised iron J or L hooks bolts and nuts 8mm diameter with bitumen and G.I. limpet washers or with complete excluding the cost of purlins, rafters and trusses.-0.63 mm thick sheet. | 10.8 | 543.4 | 5868.72 |
11 | Transportation of 20 MM metal | 7.5 | 252.8 | 1896 |
12 | Add if Lead is more than 5.00Km-For every 0.5 Kms. Lead beyond 10 Kms. and part there of upto 30 Kms. | 0.43 | 252.8 | 108.704 |
13 | Transportation of sand | 3 | 785.52 | 2356.56 |
14 | Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars. | 0.4 | 227.52 | 91.008 |
15 | Earth work in excavation in trenches for foundations and for pipes,cables etc.not exceeding 1.5 m in width and for shafts,cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including gettin-Dense or hard soil | 8.5 | 79.9 | 679.15 |
16 | Earth work in excavation in trenches for foundations and for pipes,cables etc.not exceeding 1.5 m in width and for shafts,cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including gettin-Hard moorum | 6.25 | 97.8 | 611.25 |
17 | work charge | 9 | 146 | 1314 |
18 | contingency | 1 | 1139.31 | 1139.31 |
19 | Labour difference in case of old SoR | 89 | 14 | 1246 |