S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | (III) Lead upto 200 meters | 41.4 | 110.353623188406 | 4568.64 |
2 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20cm in depth consolidating each deposited layers by ramming and watering lead upto 50m and lift upto 1.5m | 3.42 | 58.5175438596491 | 200.13 |
3 | (b) Metal, single or gravel | 41.4 | 41.6550724637681 | 1724.52 |
4 | (V) 2.5 Km. Lead | 41.4 | 184.898550724638 | 7654.8 |
5 | Providing and construction for retaining earth etc. with segments of wire crates of size 7mx3mx0.6m each divided into 1.5m compartments by cross netting, made from 4mm galvanised steel wire@32kg per 10 sqm having minimum tensile strength of 300 Mpa conforming to IS:280 and galvanizing coating conforming to IS:4826, woven into mesh with double twist, mesh size not exceeding 100x100mm, filled with boulders with least dimension of 200mm, all loose ends to be tied with 4mm galvanised steel wire | 41.4 | 812.841062801932 | 33651.62 |
6 | Site clearance, cutting grass, raking into heaps and removing off the premises | 48 | 2.666875 | 128.01 |
7 | c (iii) Hard moorum for Tank Work | 20.82 | 181.560038424592 | 3780.08 |
8 | Collection of boulders at source (maximum size 0.014cum) without quarrying i.e. picked up boulders. | 41.4 | 163.567391304348 | 6771.69 |