S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Cement Concrete 1:8:16 with brick
ballast 40mm gauge. | 1.48 | 2420.42567567568 | 3582.23 |
2 | Cement concrete 1:2:4 with stone ballast or shingle | 2.23 | 4397.69058295964 | 9806.85 |
3 | Damp proof course 4 cm thick of cement concrete 1:2:4 with water proofing compound as per manufacturer guide lines. | 19.51 | 238.853408508457 | 4660.03 |
4 | First class burnt brick laid in cement sand mortar 1:5 in foundation and plinth | 5.5 | 3744.06545454545 | 20592.36 |
5 | 12.5 mm thick cement plaster 1:4. | 52.02 | 141.041522491349 | 7336.98 |
6 | Steel work, fixed independently without
connecting plates, including cutting, hoisting and fixing in position :-
(C) Tees, angles and channels. | 20 | 5708.5865 | 114171.73 |
7 | Providing & Fixing of 10 guage welded mesh of 25mm x 25mm size fixed on steel glazing with M S flat 20mm x 6mm beeding complete in all respect including painting two coats with Synthetic Enamel Paint and Priming coat. | 416.19 | 597.3755015738 | 248621.71 |
8 | Other Works.(4.1)Earth work in excavation in foundation of building/Nalah upto 1.5 meter depth, including dressing of bottom and sides of trenches/watering, stacking the excavated soil, clear from the edge of excavation and subsequent earth filling around masonry, in 15cm. layer with compaction including disposal of all surplus soil, as directed with in a lead of 50 meter.(a) Ordinary Soil (i) 1.5meter vertical lift and 15 meter horizontal lead. | 12.88 | 177.671583850932 | 2288.41 |
9 | Shuttering for faces of concrete foundations and foundation beam & plinth beam (vertical or battering) | 23.41 | 162.764203331909 | 3810.31 |