S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | signboard | 1 | 5000 | 5000 |
2 | Contingency | 12.456 | 1000 | 12456 |
3 | Filling foundation and around masonry work with moorum I/c ramming layers and watering. | 5.14 | 158.3 | 813.662 |
4 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal) | 5.54 | 3474.1 | 19246.514 |
5 | Providing and placing in position RCC for roof, beams, columns column footing lintels chhajjas, balcony, stairs etc, excluding cost of reinforcement & centring but including finishing & curing.-CC 1:2:4 (1cement, 2sand, 4graded stone aggregate 20 mm nominal size) | 3.18 | 3615.2 | 11496.336 |
6 | False work for lintels slabs, columns, walls, sills, chhajjas balconies, beams, stair cases or ornamental moulded work, curved surface etc. cast in situ including all lead and lift | 3.76 | 250.5 | 941.88 |
7 | Brick bat filling in trenches or soak pits. | 2.65 | 253.4 | 671.51 |
8 | Random / uncoursed rubble masonry in plinth and foundation including levelling up with cement concrete 1:6:12 (1cement, 6coarse sand, 12 aggregate 20mm nominal size) at plinth level.-In Lime mortar 1:2 (1lime putty, 2sand) | 13.67 | 2531.9 | 34611.073 |
9 | Random / uncoursed rubble masonry in plinth and foundation including levelling up with cement concrete 1:6:12 (1cement, 6coarse sand, 12 aggregate 20mm nominal size) at plinth level.-In Lime mortar 1:3 (1lime putty, 3sand) | 27.34 | 2727.7 | 74575.318 |
10 | Random / uncoursed rubble masonry in plinth and foundation including levelling up with cement concrete 1:6:12 (1cement, 6coarse sand, 12 aggregate 20mm nominal size) at plinth level.-In Cement mortar 1:4 (1cement, 4sand) | 27.34 | 2923.5 | 79928.49 |
11 | Random / uncoursed rubble masonry in plinth and foundation including levelling up with cement concrete 1:6:12 (1cement, 6coarse sand, 12 aggregate 20mm nominal size) at plinth level.-In Cement mortar 1:5 (1cement, 5sand) | 8.164 | 3119.3 | 25465.9652 |
12 | Random / uncoursed rubble masonry in plinth and foundation including levelling up with cement concrete 1:6:12 (1cement, 6coarse sand, 12 aggregate 20mm nominal size) at plinth level.-In Cement mortar 1:6 (1cement, 6sand) | 13.24 | 2531.9 | 33522.356 |
13 | Class 25 open bhatta or pajawa burnt brick masonry in plinth and foundation.-Lime Mortar 1: 2(1lime, 2sand) | 1.08 | 2909.5 | 3142.26 |
14 | Providing and placing in position tested steel for R.C.C. work including cutting, bending, binding etc. as per drawings and placing in position complete up to floor two level including cost of binding wire and all wastage etc. complete.-Cold twisted / Hot rolled deformed / Thermo mechanicaly treated steel bars | 135.78 | 56.6 | 7685.148 |
15 | TRANSPORTATION OF MATERIAL | 102 | 1000 | 102000 |
16 | 20mm thick cement plaster in two coat on rough side of wall in-Cement mortar 1:3 (1cement, 3sand) | 4.7 | 188.7 | 886.89 |
17 | Extra rate for finishing with a floating cot of neat cement slurry over cement plaster of any thickness. | 9.55 | 33.6 | 320.88 |
18 | Pointing on random rubble masonry or uncoursed stone masonry with cement mortar 1:3 (1cement, 3sand)-Flush pointing | 40.683 | 153.8 | 6257.0454 |
19 | Rough chisel dressed sand stone flooring over 20mm average thick base of cement mortar 1:5 (1cement, 5sand) with joints finished flush (Area of each stone should not be less than 0.20 Sqm.)-With 25 mm thick stone | 53.37 | 398.7 | 21278.619 |
20 | Earth work for well excavation including disposal or stacking of excavated soil lead upto 50m lift upto 1.5m-Disintegrated or soft rock (not requiring blasting) | 11.73 | 88.4 | 1036.932 |
21 | Earth work for well excavation-Disintegrated or soft rock (not requiting blasting) lift from 9.00 m. to 9.50 m. | 14.13 | 727.5 | 10279.575 |
22 | Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 9.50 m. to 10.00 m. | 14.13 | 741.6 | 10478.808 |
23 | Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 10.00 m. to 10.50 m. | 14.13 | 755.7 | 10678.041 |
24 | Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 11.00 m. to 11.50 m. | 14.13 | 791.7 | 11186.721 |
25 | Earth work for well excavation-Hard rock requiring chiselling (where blasting is prohibited) lift from 10.50 m. to 11.00 m. | 14.13 | 773.7 | 10932.381 |
26 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed. -Loose or soft soil for Road Work | 66.26 | 130.3 | 8633.678 |
27 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-oose or soft soil for Well Work | 22.08 | 138.1 | 3049.248 |
28 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed -Loose or soft soil for Tank Work | 22.08 | 145.9 | 3221.472 |
29 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed -Dense or hard soil for Road Work | 22.08 | 153.7 | 3393.696 |
30 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed - Dense or hard soil for Well Work | 22.08 | 161.5 | 3565.92 |
31 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed- Dense or hard soil for Tank Work | 22.08 | 169.3 | 3738.144 |
32 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed-Hard moorum for Road Work | 22.08 | 177.1 | 3910.368 |
33 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.Hard moorum for Well Work | 22.08 | 184.9 | 4082.592 |
34 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.Hard moorum for Tank Work | 22.08 | 192.7 | 4254.816 |
35 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal or stacking of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.Disintegrated or soft rock (not requiring blasting) for Tank Work | 22.08 | 505.1 | 11152.608 |
36 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal or stacking of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.Disintegrated or soft rock (not requiring blasting) for Well Work | 22.08 | 519.2 | 11463.936 |
37 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal or stacking of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.Dense or hard soil (PT/30/30) | 22.08 | 533.3 | 11775.264 |
38 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal or stacking of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.Hard rock requiring blasting for Tank Work | 22.08 | 547.4 | 12086.592 |
39 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal or stacking of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.Hard rock requiring blasting for Well Work | 22.08 | 561.5 | 12397.92 |
40 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal or stacking of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.Hard moorum (CP/3/0.45) | 22.08 | 575.6 | 12709.248 |