S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared. | 4875 | 3.4 | 16575 |
2 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Dense or hard soil | 1500 | 67.8 | 101700 |
3 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Hard moorum | 1000 | 81.6 | 81600 |
4 | Dag-beling-Single spade stroke minimum 75mm deep | 1950 | 0.2 | 390 |
5 | Collection of approved soil having CBR not less then 12, including stacking at quarry. | 700 | 99.3 | 69510 |
6 | Transportation charges of water for every additional 200m or part thereof, beyond initial lead of 200m up to 2 Km. Lead for | 3200 | 10.8 | 34560 |
7 | Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars. | 1600 | 83.88 | 134208 |
8 | Transportation rates for Hume pipes (NP-3) 800 mm to 900 mm dia. | 7.5 | 463.68 | 3477.6 |
9 | Rolling and consolidating water bound mecadam coat with any size of metal of any thickness upto 100mm thickness(including rolling screening or binding materials) including watering & filling in depressions which occur during the process with power roller-Including hire and running expenses of roller | 700 | 45.1 | 31570 |
10 | Providing and laying reinforced cement concrete pipes N.P.3 for culverts including pointing ends, and fixing collar with cement martar 1:2 complete.-900 mm dia. | 7.5 | 1946.7 | 14600.25 |
11 | work charge | 1 | 3809 | 3809 |