S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | signboard | 1 | 2000 | 2000 |
2 | Contingency | 1 | 17044 | 17044 |
3 | Work charge | 8 | 1000 | 8000 |
4 | Extra for every additional Lead beyond 50metres or part thereof upto 200 m for every 50 m lead | 357.75 | 21.9 | 7834.725 |
5 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20cm in depth consolidating each deposited layers by ramming and watering lead upto 50m and lift upto 1.5m | 0 | 0 | 0 |
6 | Labour only for item no.0402 | 200.45 | 35.9 | 7196.155 |
7 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal) | 0.69 | 3089.9 | 2132.031 |
8 | Add to item No. 0413 and 0415 if in place of 40mm metal.-If 20 mm graded metal is used | 0.69 | 169.4 | 116.886 |
9 | Random/ uncoursed rubble masonry in plinth and foundation, stones laid dry, well bounded, faced with selected stones and built with through stones evenly placed at the rate of two per sqm | 122.08 | 814.6 | 99446.368 |
10 | Random / uncoursed rubble masonry in plinth and foundation including levelling up with cement concrete 1:6:12 (1cement, 6coarse sand, 12 aggregate 20mm nominal size) at plinth level.-In Cement mortar 1:6 (1cement, 6sand) | 4.48 | 1984.7 | 8891.456 |
11 | Add extra for brick masonry circular in plan, I/c wells to a mean radius not exceeding 6m (Such as well stening and other similar type of works) | 127.62 | 265.5 | 33883.11 |
12 | Add to item no.0605 and 0609 for well staining-For every 3meter up to 15 meter depth. | 122.08 | 172.3 | 21034.384 |
13 | TRANSPORTATION OF MATERIAL | 1 | 31812 | 31812 |
14 | Pointing on random rubble masonry or uncoursed stone masonry with cement mortar 1:4 (1cement, 4sand)-Flush pointing | 25.62 | 71.2 | 1824.144 |
15 | Collection of hard metal other then black trap basalt and granite for building work (without blasting) .-40 mm nominal size | 8.1 | 330.8 | 2679.48 |
16 | Transportation of metal | 24.3 | 153.8 | 3737.34 |
17 | Earth work for well excavation including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Dense or hard soil | 86.78 | 82.8 | 7185.384 |
18 | Earth work for well excavation-Soil lift from 10.50 m. to 11.00 m. | 14.03 | 256.2 | 3594.486 |
19 | Earth work for well excavation-soil lift from 14.00 m. to 14.50 m. | 12.04 | 332.5 | 4003.3 |
20 | Earth work for well excavation-Hard moorum lift from 1.5 m. to 2.00 m. | 26.03 | 114.2 | 2972.626 |
21 | Earth work for well excavation-Hard moorum lift from 2.00 m. to 2.50 m. | 24.96 | 120.8 | 3015.168 |
22 | Earth work for well excavation-Hard moorum lift from 2.50 m. to 3.00 m. | 23.69 | 127.4 | 3018.106 |
23 | Earth work for well excavation-Hard moorum lift from 3.00 m. to 3.50 m. | 22.94 | 134 | 3073.96 |
24 | Earth work for well excavation-Hard moorum lift from 5.50 m. to 6.00 m. | 19.34 | 167 | 3229.78 |
25 | Earth work for well excavation-Hard moorum lift from 3.50 m. to 4.00 m. | 22.19 | 140.6 | 3119.914 |
26 | Earth work for well excavation-Hard moorum lift from 4.00 m. to 4.50 m. | 21.46 | 147.2 | 3158.912 |
27 | Earth work for well excavation-Hard moorum lift from 4.50 m. to 5.00 m. | 20.74 | 153.8 | 3189.812 |
28 | Earth work for well excavation-Hard moorum lift from 5.00 m. to 5.50 m. | 20.03 | 160.4 | 3212.812 |
29 | Earth work for well excavation-Hard moorum lift from 6.00 m. to 6.50 m. | 18.65 | 175.7 | 3276.805 |
30 | Earth work for well excavation-Hard moorum lift from 6.50 m. to 7.00 m. | 17.98 | 184.4 | 3315.512 |
31 | Earth work for well excavation-Hard moorum lift from 7.00 m. to 7.50 m. | 17.33 | 193.1 | 3346.423 |
32 | Earth work for well excavation-Hard moorum lift from 7.50 m. to 8.00 m. | 16.68 | 201.8 | 3366.024 |
33 | Earth work for well excavation-Hard moorum lift from 8.00 m. to 8.50 m. | 16.05 | 210.5 | 3378.525 |
34 | Earth work for well excavation-Hard moorum lift from 8.50 m. to 9.00 m. | 15.43 | 219.2 | 3382.256 |
35 | Earth work for well excavation-Hard moorum lift from 9.00 m. to 9.50 m. | 14.96 | 227.9 | 3409.384 |
36 | Earth work for well excavation-Hard moorum lift from 9.50 m. to 10.00 m. | 14.62 | 236.6 | 3459.092 |
37 | Earth work for well excavation-Hard moorum lift from 10.00 m. to 10.50 m. | 14.31 | 245.3 | 3510.243 |
38 | Earth work for well excavation-Hard moorum lift from 11.00 m. to 11.50 m. | 13.75 | 267.1 | 3672.625 |
39 | Earth work for well excavation-Hard moorum lift from 11.50 m. to 12.00 m. | 13.45 | 278 | 3739.1 |
40 | Earth work for well excavation-Hard moorum lift from 12.00 m. to 12.50 m. | 13.15 | 288.9 | 3799.035 |
41 | Earth work for well excavation-Hard moorum lift from 13.00 m. to 13.50 m. | 12.61 | 310.7 | 3917.927 |
42 | Earth work for well excavation-Hard moorum lift from 13.50 m. to 14.00 m. | 12.33 | 321.6 | 3965.328 |
43 | Earth work for well excavation-Hard moorum lift from 14.50 m. to 15.00 m. | 11.78 | 343.4 | 4045.252 |