S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Earth work in excavation in foundation trenches or drain i/c dressing of sides and ramming of bottom lift upto 1.5m i/c getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50 m(1.10.1) Loose/Soft Soil | 6595 | 61 | 402295 |
2 | Collection of cut materials in small heaps and controlled burning | 1 | 1198 | 1198 |
3 | Conveying from stacks and spreding metal over the road surface to proper camber and consolidation with P.R.R. with all labour and T&P required for the work including Cost & Conveyance of Material and running and hire charges of P.R.R. etc. complete. | 6595 | 35 | 230825 |
4 | Dry stone masonry or rough stone dry masonry for guard wall with hard granite stones. | 57 | 3888 | 221616 |
5 | Earth work exavation in foundation in ordinary soil with all lead and lift including rough dressing and breaking of clods to maximum 5 cm to 7 cm and laying in layers not exceeding 0.3 m in depth as per direction of engineer in charge. | 1074 | 9 | 9666 |