Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 27-Jun-2024 01:50:18 AM 
Back  
State: MANIPUR District: CHURACHANDPUR Block: Tuiboung Panchayat: Bethel
Work Code: 2003009005/WC/9549 (Construction/Renovation of Pond with stone mas.wall at Bethel)
Work Category: Water Conservation
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2017-2018 Execution Level : GP
Execution Agency : Gram Panchayat (3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 10/5/2018 Work start date : 10/6/2018
Present status : Non-existent Proposed Status : Constr of Gabion Anicut for Community
Tech Sanction Details
Technical Sanction No. : MGNREGS/7/W(2)/2018-19(17) Sanction Date : 15/6/2018
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
605891 259709 0 0 0 0 0 260000 0 865600
Financial Sanction Details
Financial\Administrative Sanction No: MGNREGS/7/W(2)/2018-19(17) Financial\Administrative Sanction Date 15/6/2018
Fin. Sanc. Amt. (in Rs) NREGA:865600 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
866000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Earth work in excavation in foundation trenches or drain i/c dressing of sides and ramming of bottom lift upto 1.5m i/c getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50 m(1.10.1) Loose/Soft Soil659561402295
2Collection of cut materials in small heaps and controlled burning111981198
3Conveying from stacks and spreding metal over the road surface to proper camber and consolidation with P.R.R. with all labour and T&P required for the work including Cost & Conveyance of Material and running and hire charges of P.R.R. etc. complete.659535230825
4Dry stone masonry or rough stone dry masonry for guard wall with hard granite stones.573888221616
5Earth work exavation in foundation in ordinary soil with all lead and lift including rough dressing and breaking of clods to maximum 5 cm to 7 cm and laying in layers not exceeding 0.3 m in depth as per direction of engineer in charge.107499666
Total Activity 866000
S.NoMaterialQuantityUnit PriceTotal
1Display board150005000
2Mate renumeration194007600
3Stone Boulder614000244000
4Transportation charges of mate131093109
Total Material 260000